Nantucket Hybrid

Brownfield

Nantucket, Nantucket, Massachusetts · Nantucket Electric Co

Legacy capacity
20
MW

Nantucket Hybrid is a oil plant in Nantucket, Nantucket, Massachusetts, retired 2019-08-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 20 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former useoil plant
Site typeretired_plant
Existing capacity20 MW
Retirement date2019-08-01
EIA plant ID#1615

Grid hookup & remediation

Nearest substation29.8 mi
OperatorNantucket Electric Co
Operator addressBunker Road, Nantucket, MA, 2554
Why this site is datacenter-attractive: a oil plant of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Nearby datacenter candidate sites

Scored candidate sites near Nantucket Hybrid, ranked by DC Readiness.

Candidate sites near Nantucket Hybrid
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN133715Substation-AdjacentMABarnstable County115 kV100 MW3.5 yrs59.0
OZ BarnstableGreenfieldMABarnstable3.5 yrs52.0
EC Near Nantucket HybridGreenfieldMANantucket3.5 yrs50.4
EC Near Nantucket HybridGreenfieldMANantucket3.5 yrs50.1
EC Near Nantucket HybridGreenfieldMANantucket3.5 yrs48.2
EC Near Nantucket HybridGreenfieldMANantucket3.5 yrs47.6
EC Near Nantucket HybridGreenfieldMANantucket3.5 yrs46.7
Nantucket HybridBrownfieldMANantucket County20 MW3.5 yrs46.4

See all datacenter sites in Massachusetts

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.