Shawnee

Brownfield

West Paducah, McCracken, Kentucky · Tennessee Valley Authority

Legacy capacity
175
MW

Shawnee is a coal plant in West Paducah, McCracken, Kentucky, retired 2014-06-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 175 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former usecoal plant
Site typeretired_plant
Existing capacity175 MW
Retirement date2014-06-01
EIA plant ID#1379

Grid hookup & remediation

Nearest substation0.2 mi
Operator address7900 Metropolis Lake Rd., West Paducah, KY, 42086
Why this site is datacenter-attractive: a coal plant of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Site conditions & market — McCracken County

County-level intelligence for this site's location — the power economics, water, hazard, connectivity, and workforce a developer screens before ever visiting. Assembled from FEMA NRI, BLS QCEW, FCC BDC, USGS water-use, and EIA.

Market & workforce

Total employment (laborshed)36,794
Construction employment2,644
Land value$5,673/acre
Datacenter tax incentivesales_tax_exemption

Power economics & interconnection

Commercial power rate10.05¢/kWh
Industrial power rate8.60¢/kWh
Load growth (FERC-714)0.5%

Water & cooling

Water stressLow
Public water supply8.2 MGD
Industrial water use4.4 MGD
Cooling degree days1,300
Mean annual temp56°F

Hazard, flood & connectivity

FEMA risk index30.0 · Relatively Moderate
Fiber providers7 · 43% served

County-level context — address-level utility offerings and flood zoning vary within the county. Confirm site-specific service with the utility and a Phase I ESA.

Get alerts

Track Shawnee

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Nearby datacenter candidate sites

Scored candidate sites near Shawnee, ranked by DC Readiness.

Candidate sites near Shawnee
SiteTypeStateCountyVoltageCapacityQueue waitScore
SHAWNEESubstation-AdjacentKYMassac County500 kV1,000 MW3.8 yrs70.0
JOPPA 345Substation-AdjacentILMassac County345 kV600 MW3.8 yrs66.0
MARSHALLSubstation-AdjacentKYMarshall County500 kV1,000 MW3.8 yrs65.9
OZ JohnsonGreenfieldILJohnson——4.6 yrs61.4
EC Coal Massac CountyGreenfieldILMassac County——4.6 yrs61.0
EC Near ShawneeGreenfieldKYMcCracken——3.6 yrs60.8
EC Near ShawneeGreenfieldKYMcCracken——3.6 yrs60.4
UNKNOWN155604Substation-AdjacentKYMcCracken County161 kV100 MW3.8 yrs60.3

Nearby internet exchanges

See all datacenter sites in Kentucky →

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Shawnee, West Paducah, McCracken, Kentucky. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.