66.0
Good / 100

JOPPA 345 is a substation-adjacent datacenter candidate site in Massac County, Illinois, interconnecting through PJM. It screens at 66.0/100 DC Readiness with a catalogued 600 MW of candidate capacity and a 3.8 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationJOPPA 345
Substation distance0.0 mi
Substation voltage345 kV
Available capacity600 MW
UtilitySOUTHERN ILLINOIS ELEC COOPnot available

Speed to power

Interconnection outlookModerate
≈ 3.8 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionPJM
Queue depth393
Avg queue wait3.8 yrs

Connectivity

Nearest IXPQuad State Internet METRO1 Colocation
IXP distance8.2 mi
Fiber providers5
Fiber coverage40.7%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score65/100

Location context

Nearest datacenterQuad State Internet METRO1 Colocation
DC distance8.2 mi
County hazard (FEMA NRI)Relatively High (35)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity10.23¢/kWh
Industrial electricity5.09¢/kWh
Cooling degree days1,100
Heating degree days5,600
Land price / acre$4,582

Regulatory climate

Restrictivestate posture · as of 2026-08

New-DC state tax exemptions suspended for 2 years (from Jul 2026).

DC tax incentiveNo / suspended

Incentive detail: Enterprise Zone sales tax exemption; High Impact Business designation for $12M+ DC investments.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 6 nearby

Get alerts

Track JOPPA 345

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
87
Speed to power20%
49
Fiber connectivity12%
80
Energy cost10%
50
Water risk7%
88
Natural hazard6%
65
Buildability7%
60
Labor market4%
50
DC cluster4%
80
Land / acreage3%
40
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
70

Nearby comparable sites

Other scored datacenter candidate sites in Massac County, ranked by DC Readiness.

Sites near JOPPA 345
SiteTypeVoltageCapacityQueue waitScore
SHAWNEESubstation-Adjacent500 kV1,000 MW3.8 yrs70.0
EC Coal Massac CountyGreenfield——4.6 yrs61.0
UNKNOWN121869Substation-Adjacent161 kV100 MW3.8 yrs59.8
Laidlaw Property (former)Industrial——3.8 yrs55.2
Greenfield (C-35 (DOE) - JOPPA STATION)Greenfield161 kV100 MW3.8 yrs52.0
Greenfield (C-33 (DOE) - JOPPA STATION)Greenfield161 kV100 MW3.8 yrs51.8

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.