Hoisington is a natural gas plant in Hoisington, Barton, Kansas, retired 2021-06-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 7 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former usenatural gas plant
Site typeretired_plant
Existing capacity7 MW
Retirement date2021-06-01
EIA plant ID#1286

Grid hookup & remediation

Nearest substation6.5 mi
OperatorCity of Hoisington - (KS)
Operator address164 South Elm, Hoisington, KS, 67544
Why this site is datacenter-attractive: a natural gas plant of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Nearby datacenter candidate sites

Scored candidate sites near Hoisington, ranked by DC Readiness.

Candidate sites near Hoisington
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN119927Substation-AdjacentKSRussell County115 kV100 MW3.5 yrs67.9
UNKNOWN119925Substation-AdjacentKSRussell County115 kV100 MW3.5 yrs66.1
UNKNOWN118036Substation-AdjacentKSBarton County230 kV300 MW3.5 yrs65.7
Greenfield (UNKNOWN118036 - UNKNOWN118146)GreenfieldKSRush County230 kV300 MW3.5 yrs64.6
TAP149317Substation-AdjacentKSRussell County115 kV100 MW3.5 yrs64.5
UNKNOWN119897Substation-AdjacentKSEllsworth County115 kV100 MW3.5 yrs64.4
Greenfield (UNKNOWN118036 - UNKNOWN118146)GreenfieldKSBarton County230 kV300 MW3.5 yrs63.7
Greenfield (UNKNOWN118036 - UNKNOWN118146)GreenfieldKSRush County230 kV300 MW3.5 yrs63.6

See all datacenter sites in Kansas

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Hoisington, Hoisington, Barton, Kansas. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.