Great Bend - Midwest Energy
BrownfieldGreat Bend, Barton, Kansas · Midwest Energy Inc - (KS)
Great Bend - Midwest Energy is a natural gas plant in Great Bend, Barton, Kansas, retired 2013-12-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 10 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.
Former use & capacity
Grid hookup & remediation
Site conditions & market — Barton County
County-level intelligence for this site's location — the power economics, water, hazard, connectivity, and workforce a developer screens before ever visiting. Assembled from FEMA NRI, BLS QCEW, FCC BDC, USGS water-use, and EIA.
Market & workforce
Power economics & interconnection
Water & cooling
Hazard, flood & connectivity
County-level context — address-level utility offerings and flood zoning vary within the county. Confirm site-specific service with the utility and a Phase I ESA.
Nearby brownfield & retired-generation sites
A proximity screen of other retired-plant, contaminated, and EPA-flagged sites near Great Bend - Midwest Energy — the environmental neighborhood, ranked by legacy grid capacity.
| Site | Former use | Legacy MW | Distance | Cleanup status |
|---|---|---|---|---|
| Larned | natural gas plant | 13 | 21.8 mi | — |
| Hoisington | natural gas plant | 7 | 9.8 mi | — |
| Gas Turbine (KS) | natural gas plant | 1 | 22.2 mi | — |
Derived from GridCensus's retired-generator & EPA brownfield dataset. Not a substitute for an ASTM E1527 Phase I environmental radius report.
Get alerts
Track Great Bend - Midwest Energy
Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.
Nearby datacenter candidate sites
Scored candidate sites near Great Bend - Midwest Energy, ranked by DC Readiness.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| EC Near Larned | Greenfield | KS | Pawnee | — | — | 3.5 yrs | 58.4 |
| EC Near Larned | Greenfield | KS | Pawnee | — | — | 3.5 yrs | 58.1 |
| UNKNOWN118036 | Substation-Adjacent | KS | Barton County | 230 kV | 300 MW | 3.3 yrs | 57.7 |
| EC Near Hoisington | Greenfield | KS | Barton | — | — | 3.5 yrs | 57.5 |
| EC Near Larned | Greenfield | KS | Pawnee | — | — | 3.5 yrs | 57.3 |
| EC Near Great Bend - Midwest Energy | Greenfield | KS | Barton | — | — | 3.5 yrs | 57.2 |
| EC Near Great Bend - Midwest Energy | Greenfield | KS | Barton | — | — | 3.5 yrs | 57.2 |
| EC Near Hoisington | Greenfield | KS | Barton | — | — | 3.5 yrs | 57.2 |
See all datacenter sites in Kansas →
Dataset updated . Screening estimates derived from public data sources.
Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.
Go deeper than the public screen
Every site and score for Great Bend - Midwest Energy, Great Bend, Barton, Kansas is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.