Great Bend - Midwest Energy

Brownfield

Great Bend, Barton, Kansas · Midwest Energy Inc - (KS)

Legacy capacity
10
MW

Great Bend - Midwest Energy is a natural gas plant in Great Bend, Barton, Kansas, retired 2013-12-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 10 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former usenatural gas plant
Site typeretired_plant
Existing capacity10 MW
Retirement date2013-12-01
EIA plant ID#1334

Grid hookup & remediation

Nearest substation0.7 mi
OperatorMidwest Energy Inc - (KS)
Operator address1025 Patton Road, Great Bend, KS, 67530
Why this site is datacenter-attractive: a natural gas plant of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Nearby datacenter candidate sites

Scored candidate sites near Great Bend - Midwest Energy, ranked by DC Readiness.

Candidate sites near Great Bend - Midwest Energy
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN118036Substation-AdjacentKSBarton County230 kV300 MW3.5 yrs65.7
Greenfield (UNKNOWN118036 - UNKNOWN118146)GreenfieldKSRush County230 kV300 MW3.5 yrs64.6
UNKNOWN118056Substation-AdjacentKSEdwards County115 kV100 MW3.5 yrs63.9
Greenfield (UNKNOWN118036 - UNKNOWN118146)GreenfieldKSBarton County230 kV300 MW3.5 yrs63.7
Greenfield (UNKNOWN118036 - UNKNOWN118146)GreenfieldKSRush County230 kV300 MW3.5 yrs63.6
TAP138845Substation-AdjacentKSPawnee County115 kV100 MW3.5 yrs63.6
TAP138850Substation-AdjacentKSBarton County115 kV100 MW3.5 yrs63.6
UNKNOWN119941Substation-AdjacentKSBarton County115 kV100 MW3.5 yrs63.5

See all datacenter sites in Kansas

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.

Go deeper than the public screen