Waverly Municipal Electric North Plant
BrownfieldWaverly, Bremer, Iowa · Waverly Municipal Elec Utility
Waverly Municipal Electric North Plant is a natural gas plant in Waverly, Bremer, Iowa, retired 2013-09-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 3 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.
Former use & capacity
Grid hookup & remediation
Site conditions & market — Bremer County
County-level intelligence for this site's location — the power economics, water, hazard, connectivity, and workforce a developer screens before ever visiting. Assembled from FEMA NRI, BLS QCEW, FCC BDC, USGS water-use, and EIA.
Market & workforce
Power economics & interconnection
Water & cooling
Hazard, flood & connectivity
County-level context — address-level utility offerings and flood zoning vary within the county. Confirm site-specific service with the utility and a Phase I ESA.
Nearby brownfield & retired-generation sites
A proximity screen of other retired-plant, contaminated, and EPA-flagged sites near Waverly Municipal Electric North Plant — the environmental neighborhood, ranked by legacy grid capacity.
| Site | Former use | Legacy MW | Distance | Cleanup status |
|---|---|---|---|---|
| Sumner | oil plant | 6 | 20.5 mi | — |
Derived from GridCensus's retired-generator & EPA brownfield dataset. Not a substitute for an ASTM E1527 Phase I environmental radius report.
Get alerts
Track Waverly Municipal Electric North Plant
Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.
Nearby datacenter candidate sites
Scored candidate sites near Waverly Municipal Electric North Plant, ranked by DC Readiness.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| BLACK HAWK | Substation-Adjacent | IA | Black Hawk County | 345 kV | 600 MW | 2.8 yrs | 66.4 |
| OZ Black Hawk | Greenfield | IA | Black Hawk | — | — | 1.4 yrs | 65.3 |
| EC Near Waverly Municipal Electric North Plant | Greenfield | IA | Bremer | — | — | 1.4 yrs | 64.9 |
| EC Near Waverly Municipal Electric North Plant | Greenfield | IA | Bremer | — | — | 1.4 yrs | 63.4 |
| UNKNOWN137006 | Substation-Adjacent | IA | Black Hawk County | 161 kV | 100 MW | 2.8 yrs | 62.6 |
| UNKNOWN137007 | Substation-Adjacent | IA | Black Hawk County | 161 kV | 100 MW | 2.8 yrs | 62.6 |
| TAP163591 | Substation-Adjacent | IA | Black Hawk County | 161 kV | 100 MW | 2.8 yrs | 62.6 |
| EC Near La Porte | Greenfield | IA | Black Hawk | — | — | 1.4 yrs | 62.4 |
Nearby internet exchanges
- SFN IA-WaterlooWaterloo, IA · 6 networks
- Cologix DSM2Cedar Falls, IA · 2 networks
- SFN IA-UrbanaUrbana, IA · 1 networks
- Connect Cedar ValleyCedar Falls, IA · 0 networks
See all datacenter sites in Iowa →
Dataset updated . Screening estimates derived from public data sources.
Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.
Go deeper than the public screen
Every site and score for Waverly Municipal Electric North Plant, Waverly, Bremer, Iowa is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.