Mt Pleasant

Brownfield

Mt Pleasant, Henry, Iowa · City of Mt Pleasant - (IA)

Legacy capacity
9
MW

Mt Pleasant is a natural gas plant in Mt Pleasant, Henry, Iowa, retired 2002-01-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 9 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former usenatural gas plant
Site typeretired_plant
Existing capacity9 MW
Retirement date2002-01-01
EIA plant ID#1166

Grid hookup & remediation

Nearest substation7.2 mi
OperatorCity of Mt Pleasant - (IA)
Operator address509 North Adams Street, Mt Pleasant, IA, 52641
Why this site is datacenter-attractive: a natural gas plant of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Nearby datacenter candidate sites

Scored candidate sites near Mt Pleasant, ranked by DC Readiness.

Candidate sites near Mt Pleasant
SiteTypeStateCountyVoltageCapacityQueue waitScore
TAP140530Substation-AdjacentIAWashington County345 kV600 MW1.4 yrs75.7
SUB TSubstation-AdjacentIALee County345 kV600 MW1.4 yrs68.0
Greenfield (SUB T - LOUISA)GreenfieldIALouisa County345 kV600 MW1.4 yrs67.3
Greenfield (TAP140530 - SUB T)GreenfieldIAWashington County345 kV600 MW1.4 yrs67.0
DENMARKSubstation-AdjacentIADes Moines County161 kV100 MW1.4 yrs66.4
JEFFERSONSubstation-AdjacentIAHenry County161 kV100 MW1.4 yrs66.0
VIELESubstation-AdjacentIALee County161 kV100 MW1.4 yrs66.0
Greenfield (SUB T - LOUISA)GreenfieldIALouisa County345 kV600 MW1.4 yrs65.7

See all datacenter sites in Iowa

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.