BrownfieldWheatfield, Jasper, Indiana · Northern Indiana Pub Serv Co
R M Schahfer is a coal plant in Wheatfield, Jasper, Indiana, retired 2021-10-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 1,096 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.
Former use & capacity
Grid hookup & remediation
Site conditions & market — Jasper County
County-level intelligence for this site's location — the power economics, water, hazard, connectivity, and workforce a developer screens before ever visiting. Assembled from FEMA NRI, BLS QCEW, FCC BDC, USGS water-use, and EIA.
Market & workforce
Power economics & interconnection
Water & cooling
Hazard, flood & connectivity
County-level context — address-level utility offerings and flood zoning vary within the county. Confirm site-specific service with the utility and a Phase I ESA.
Nearby brownfield & retired-generation sites
A proximity screen of other retired-plant, contaminated, and EPA-flagged sites near R M Schahfer — the environmental neighborhood, ranked by legacy grid capacity.
| Site | Former use | Legacy MW | Distance | Cleanup status |
|---|---|---|---|---|
| Rensselaer City Light Plant | natural gas plant | 25 | 20.3 mi | — |
| Herrema Dairy | natural gas plant | 2 | 15.0 mi | — |
Derived from GridCensus's retired-generator & EPA brownfield dataset. Not a substitute for an ASTM E1527 Phase I environmental radius report.
Get alerts
Track R M Schahfer
Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.
Nearby datacenter candidate sites
Scored candidate sites near R M Schahfer, ranked by DC Readiness.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| SCHAHFER STATION | Substation-Adjacent | IN | Jasper County | 345 kV | 600 MW | 3.8 yrs | 66.1 |
| TOWER ROAD | Substation-Adjacent | IN | Porter County | 345 kV | 600 MW | 3.8 yrs | 61.9 |
| LAKE GEORGE | Substation-Adjacent | IN | Lake County | 345 kV | 600 MW | 3.8 yrs | 61.7 |
| BABCOCK | Substation-Adjacent | IN | Porter County | 345 kV | 600 MW | 3.8 yrs | 61.7 |
| ST. JOHN | Substation-Adjacent | IN | Lake County | 345 kV | 600 MW | 3.8 yrs | 61.6 |
| UNKNOWN122738 | Substation-Adjacent | IN | Lake County | 345 kV | 600 MW | 3.8 yrs | 61.1 |
| EC Near Dean H Mitchell | Greenfield | IN | Lake | — | — | 3.0 yrs | 60.9 |
| EC FFE Lake County | Greenfield | IN | Lake County | — | — | 3.0 yrs | 58.7 |
See all datacenter sites in Indiana →
Dataset updated . Screening estimates derived from public data sources.
Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for R M Schahfer, Wheatfield, Jasper, Indiana. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.