Herrema Dairy is a natural gas plant in Fair Oaks, Jasper, Indiana, retired 2023-12-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 2 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former usenatural gas plant
Site typeretired_plant
Existing capacity2 MW
Retirement date2023-12-01
EIA plant ID#65494

Grid hookup & remediation

Nearest substation6.7 mi
OperatorHerrema Dairy, LLC
Operator address10988 West 500 N, Fair Oaks, IN, 47943
Why this site is datacenter-attractive: a natural gas plant of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Nearby datacenter candidate sites

Scored candidate sites near Herrema Dairy, ranked by DC Readiness.

Candidate sites near Herrema Dairy
SiteTypeStateCountyVoltageCapacityQueue waitScore
TAP138156Substation-AdjacentINLake County345 kV600 MW4.6 yrs73.2
WILTONSubstation-AdjacentINPorter County765 kV1,000 MW4.6 yrs73.2
TAP138150Substation-AdjacentINLake County345 kV600 MW4.6 yrs72.7
UNKNOWN122738Substation-AdjacentINLake County345 kV600 MW2.2 yrs72.7
DEADEND167152Substation-AdjacentINLake County345 kV600 MW4.6 yrs72.1
TAP138153Substation-AdjacentINLake County345 kV600 MW4.6 yrs72.0
UNKNOWN122738Substation-AdjacentINLake County345 kV600 MW4.6 yrs71.0
LAKE GEORGESubstation-AdjacentINLake County345 kV600 MW4.6 yrs70.4

Nearby internet exchanges

See all datacenter sites in Indiana

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Herrema Dairy, Fair Oaks, Jasper, Indiana. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.