Newton

Brownfield

Newton, Jasper, Illinois · Illinois Power Generating Co

Legacy capacity
617
MW

Newton is a coal plant in Newton, Jasper, Illinois, retired 2016-09-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 617 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former usecoal plant
Site typeretired_plant
Existing capacity617 MW
Retirement date2016-09-01
EIA plant ID#6017

Grid hookup & remediation

Nearest substation0.1 mi
OperatorIllinois Power Generating Co
Operator address6725 N. 500th, Newton, IL, 62448
Why this site is datacenter-attractive: a coal plant of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Nearby datacenter candidate sites

Scored candidate sites near Newton, ranked by DC Readiness.

Candidate sites near Newton
SiteTypeStateCountyVoltageCapacityQueue waitScore
NEWTON STATIONSubstation-AdjacentILJasper County345 kV600 MW4.6 yrs71.7
RACCOON CREEK STATIONSubstation-AdjacentILClay County345 kV600 MW4.6 yrs70.4
CLINTONSubstation-AdjacentILRichland County230 kV300 MW4.6 yrs69.4
NEOGASubstation-AdjacentILCumberland County345 kV600 MW4.6 yrs68.6
CASEY WESTSubstation-AdjacentILCumberland County345 kV600 MW4.6 yrs68.2
ENERGY SHELBY COUNTYSubstation-AdjacentILCumberland County138 kV100 MW4.6 yrs66.2
UNKNOWN121708Substation-AdjacentILClay County138 kV100 MW4.6 yrs65.5
Greenfield (RACCOON CREEK STATION - NEWTON)GreenfieldILClay County345 kV600 MW4.6 yrs65.4

See all datacenter sites in Illinois

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.