Skip to content
Gridcensus

Cumberland, Illinois · PJM

DC Readiness
62.3
Good / 100

CASEY WEST is a substation-adjacent datacenter candidate site in Cumberland, Illinois, interconnecting through PJM. It screens at 62.3/100 DC Readiness with a catalogued 600 MW of candidate capacity and a 3.8 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationCASEY WEST
Substation distance0.0 mi
Substation voltage345 kV
Available capacity600 MW
UtilityCOLES-MOULTRIE ELECTRIC COOPcooperativemoderate to large load · state default

Speed to power

Interconnection outlookModerate
≈ 3.8 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionPJM
Queue depth393
Avg queue wait3.8 yrs

Connectivity

Nearest IXPIndiana University Data Center
IXP distance84.9 mi
Fiber providers5
Fiber coverage46.6%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score65/100

Location context

Nearest datacenterNCSA Petascale Computing Facility
DC distance57.8 mi
County hazard (FEMA NRI)Relatively High (35)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity10.84¢/kWh
Industrial electricity7.66¢/kWh
Cooling degree days1,100
Heating degree days5,600
Land price / acre$8,894

Regulatory climate

Restrictivestate posture · as of 2026-08

New-DC state tax exemptions suspended for 2 years (from Jul 2026).

DC tax incentiveNo / suspended

Incentive detail: Enterprise Zone sales tax exemption; High Impact Business designation for $12M+ DC investments.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 5 nearby

Get alerts

Track CASEY WEST

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
87
Speed to power20%
49
Fiber connectivity12%
64
Energy cost10%
50
Water risk7%
88
Natural hazard6%
65
Buildability7%
60
Labor market4%
50
DC cluster4%
40
Land / acreage3%
40
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
70

Nearby comparable sites

Other scored datacenter candidate sites in Cumberland, ranked by DC Readiness.

Sites near CASEY WEST
SiteTypeVoltageCapacityQueue waitScore
NEOGASubstation-Adjacent345 kV600 MW3.8 yrs62.3
EC FFE Cumberland CountyGreenfield4.6 yrs56.9
Greenfield (NEOGA - CASEY WEST)Greenfield345 kV600 MW3.8 yrs55.9
OZ CumberlandGreenfield4.6 yrs55.4
Mine SiteFormer Mine3.8 yrs49.7

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for CASEY WEST, Cumberland. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.