Freedom Power Project
BrownfieldSt. Elmo, Fayette, Illinois · Southwestern Electric Coop Inc - (IL)
Freedom Power Project is a natural gas plant in St. Elmo, Fayette, Illinois, retired 2024-05-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 71 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.
Former use & capacity
Grid hookup & remediation
Site conditions & market — Fayette County
County-level intelligence for this site's location — the power economics, water, hazard, connectivity, and workforce a developer screens before ever visiting. Assembled from FEMA NRI, BLS QCEW, FCC BDC, USGS water-use, and EIA.
Market & workforce
Power economics & interconnection
Water & cooling
Hazard, flood & connectivity
County-level context — address-level utility offerings and flood zoning vary within the county. Confirm site-specific service with the utility and a Phase I ESA.
Get alerts
Track Freedom Power Project
Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.
Nearby datacenter candidate sites
Scored candidate sites near Freedom Power Project, ranked by DC Readiness.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| PANA | Substation-Adjacent | IL | Christian County | 345 kV | 600 MW | 3.8 yrs | 62.9 |
| NEOGA | Substation-Adjacent | IL | Cumberland County | 345 kV | 600 MW | 3.8 yrs | 62.3 |
| UNKNOWN122158 | Substation-Adjacent | IL | Shelby County | 345 kV | 600 MW | 3.8 yrs | 61.3 |
| RAMSEY | Substation-Adjacent | IL | Fayette County | 345 kV | 600 MW | 3.8 yrs | 60.8 |
| OZ Shelby | Greenfield | IL | Shelby | — | — | 4.6 yrs | 59.5 |
| OZ Christian | Greenfield | IL | Christian | — | — | 4.6 yrs | 59.2 |
| EC Coal Clay County | Greenfield | IL | Clay County | — | — | 4.6 yrs | 57.1 |
| OZ Fayette | Greenfield | IL | Fayette | — | — | 4.6 yrs | 57.0 |
See all datacenter sites in Illinois →
Dataset updated . Screening estimates derived from public data sources.
Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for Freedom Power Project, St. Elmo, Fayette, Illinois. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.