Christian, Illinois · PJM

DC Readiness
62.9
Good / 100

PANA is a substation-adjacent datacenter candidate site in Christian, Illinois, interconnecting through PJM. It screens at 62.9/100 DC Readiness with a catalogued 600 MW of candidate capacity and a 3.8 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationPANA
Substation distance0.0 mi
Substation voltage345 kV
Available capacity600 MW
UtilitySHELBY ELECTRIC COOP, INCcooperativemoderate to large load · state default

Speed to power

Interconnection outlookModerate
≈ 3.8 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionPJM
Queue depth393
Avg queue wait3.8 yrs

Connectivity

Nearest IXPH5 Data Centers St. Louis (MO01)
IXP distance79.5 mi
Fiber providers3
Fiber coverage73.3%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score65/100

Location context

Nearest datacenterDatacenter 01133944585
DC distance61.4 mi
County hazard (FEMA NRI)Relatively High (35)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity10.09¢/kWh
Industrial electricity5.68¢/kWh
Cooling degree days1,100
Heating degree days5,600
Land price / acre$10,960

Regulatory climate

Restrictivestate posture · as of 2026-08

New-DC state tax exemptions suspended for 2 years (from Jul 2026).

DC tax incentiveNo / suspended

Incentive detail: Enterprise Zone sales tax exemption; High Impact Business designation for $12M+ DC investments.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track PANA

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
87
Speed to power20%
49
Fiber connectivity12%
69
Energy cost10%
50
Water risk7%
88
Natural hazard6%
65
Buildability7%
60
Labor market4%
50
DC cluster4%
40
Land / acreage3%
40
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
70

Nearby comparable sites

Other scored datacenter candidate sites in Christian, ranked by DC Readiness.

Sites near PANA
SiteTypeVoltageCapacityQueue waitScore
KINCAID STATIONSubstation-Adjacent345 kV600 MW3.8 yrs63.0
EC Near Archer Daniels Midland TaylorvilleGreenfield4.6 yrs59.3
OZ ChristianGreenfield4.6 yrs59.2
TAYLORVILLE SOUTHSubstation-Adjacent138 kV100 MW3.8 yrs56.9
TAP139406Substation-Adjacent138 kV100 MW3.8 yrs56.9
EC Near Archer Daniels Midland TaylorvilleGreenfield4.6 yrs56.7
EC Near Archer Daniels Midland TaylorvilleGreenfield4.6 yrs56.6
EC Near Archer Daniels Midland TaylorvilleGreenfield4.6 yrs56.5

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.