Hammond

Brownfield

Rome, Floyd, Georgia · Georgia Power Co

Legacy capacity
953
MW

Hammond is a coal plant in Rome, Floyd, Georgia, retired 2019-07-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 953 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former usecoal plant
Site typeretired_plant
Existing capacity953 MW
Retirement date2019-07-01
EIA plant ID#708

Grid hookup & remediation

Nearest substation1.1 mi
OperatorGeorgia Power Co
Operator address5963 Alabama Hwy., SW., Rome, GA, 30129
Why this site is datacenter-attractive: a coal plant of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Nearby datacenter candidate sites

Scored candidate sites near Hammond, ranked by DC Readiness.

Candidate sites near Hammond
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN110774Substation-AdjacentGAPolk County230 kV300 MW3.7 yrs70.8
UNKNOWN110637Substation-AdjacentGABartow County230 kV300 MW3.7 yrs69.9
UNKNOWN110629Substation-AdjacentGAFloyd County230 kV300 MW3.7 yrs69.4
UNKNOWN110617Substation-AdjacentGAFloyd County230 kV300 MW3.7 yrs68.7
TAP172563Substation-AdjacentGAGordon County230 kV300 MW3.7 yrs68.5
HAMMOND STATIONSubstation-AdjacentGAFloyd County230 kV300 MW3.7 yrs68.0
TAP149903Substation-AdjacentGAWalker County115 kV100 MW3.7 yrs68.0
UNKNOWN110419Substation-AdjacentGAChattooga County115 kV100 MW3.7 yrs67.8

See all datacenter sites in Georgia

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Hammond, Rome, Floyd, Georgia. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.