Bowen

Brownfield

Cartersville, Bartow, Georgia · Georgia Power Co

Legacy capacity
42
MW

Bowen is a oil plant in Cartersville, Bartow, Georgia, retired 2013-04-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 42 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former useoil plant
Site typeretired_plant
Existing capacity42 MW
Retirement date2013-04-01
EIA plant ID#703

Grid hookup & remediation

Nearest substation0.1 mi
OperatorGeorgia Power Co
Operator address317 Covered Bridge Road, SW, Cartersville, GA, 30120
Why this site is datacenter-attractive: a oil plant of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Nearby datacenter candidate sites

Scored candidate sites near Bowen, ranked by DC Readiness.

Candidate sites near Bowen
SiteTypeStateCountyVoltageCapacityQueue waitScore
BIG SHANTYSubstation-AdjacentGACobb County500 kV1,000 MW5.8 yrs79.9
VILLA RICASubstation-AdjacentGADouglas County500 kV1,000 MW5.8 yrs79.9
UNKNOWN115644Substation-AdjacentGADouglas County230 kV300 MW5.8 yrs77.1
BIG SHANTYSubstation-AdjacentGABartow County500 kV1,000 MW3.7 yrs76.8
UNKNOWN151327Substation-AdjacentGAFulton County230 kV300 MW5.8 yrs76.4
UNKNOWN115650Substation-AdjacentGADouglas County230 kV300 MW5.8 yrs76.1
UNKNOWN116279Substation-AdjacentGACobb County230 kV300 MW5.8 yrs75.7
UNKNOWN115642Substation-AdjacentGADouglas County230 kV300 MW5.8 yrs75.4

Nearby internet exchanges

See all datacenter sites in Georgia

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Bowen, Cartersville, Bartow, Georgia. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.