Brownfield

Smyrna, Cobb, Georgia · Georgia Power Co

Legacy capacity
282
MW

Atkinson is a natural gas plant in Smyrna, Cobb, Georgia, retired 2003-12-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 282 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former usenatural gas plant
Site typeretired_plant
Existing capacity282 MW
Retirement date2003-12-01
EIA plant ID#700

Grid hookup & remediation

Nearest substation0.4 mi
Operator address5551 South Cobb Drive, Smyrna, GA, 30080
Why this site is datacenter-attractive: a natural gas plant of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Nearby datacenter candidate sites

Scored candidate sites near Atkinson, ranked by DC Readiness.

Candidate sites near Atkinson
SiteTypeStateCountyVoltageCapacityQueue waitScore
NORCROSSSubstation-AdjacentGAGwinnett County500 kV1,000 MW1.0 yrs74.4
BIG SHANTYSubstation-AdjacentGACobb County500 kV1,000 MW1.0 yrs72.2
UNIONSubstation-AdjacentGAClayton County500 kV1,000 MW1.0 yrs72.1
BULL SLUICESubstation-AdjacentGACobb County500 kV1,000 MW1.0 yrs72.0
O'HARASubstation-AdjacentGAClayton County500 kV1,000 MW1.0 yrs71.7
UNKNOWN111549Substation-AdjacentGAFulton County230 kV300 MW1.0 yrs71.1
VILLA RICASubstation-AdjacentGADouglas County500 kV1,000 MW1.0 yrs70.8
UNKNOWN172426Substation-AdjacentGAFulton County230 kV300 MW1.0 yrs70.2

Nearby internet exchanges

See all datacenter sites in Georgia

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Atkinson, Smyrna, Cobb, Georgia. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.