Colebrook Hydroelectric
BrownfieldColebrook, Litchfield, Connecticut · Metropolitan Dist of Hartford
Colebrook Hydroelectric is a former hydro site in Colebrook, Litchfield, Connecticut, retired 2019-05-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 3 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.
Former use & capacity
Grid hookup & remediation
Nearby datacenter candidate sites
Scored candidate sites near Colebrook Hydroelectric, ranked by DC Readiness.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| MANCHESTER | Substation-Adjacent | CT | Capitol Planning Region | 345 kV | 600 MW | 3.5 yrs | 69.1 |
| NORTH BLOOMFIELD | Substation-Adjacent | CT | Capitol Planning Region | 345 kV | 600 MW | 3.5 yrs | 67.6 |
| TAP140774 | Substation-Adjacent | CT | Capitol Planning Region | 115 kV | 100 MW | 3.5 yrs | 64.5 |
| UNKNOWN136498 | Substation-Adjacent | CT | Capitol Planning Region | 115 kV | 100 MW | 3.5 yrs | 64.0 |
| BERLIN | Substation-Adjacent | CT | Capitol Planning Region | 115 kV | 100 MW | 3.5 yrs | 64.0 |
| BLACK ROCK | Substation-Adjacent | CT | Capitol Planning Region | 115 kV | 100 MW | 3.5 yrs | 63.7 |
| SOUTHWEST HARTFORD | Substation-Adjacent | CT | Capitol Planning Region | 115 kV | 100 MW | 3.5 yrs | 63.7 |
| TAP135698 | Substation-Adjacent | CT | Northwest Hills Planning Region | 115 kV | 100 MW | 3.5 yrs | 63.6 |
Nearby internet exchanges
- Lightboard ★ MassachusettsSpringfield, MA · 7 networks
- Crown Castle Springfield (1 Federal)Springfield, MA · 4 networks
- Lightboard ★ New EnglandSpringfield, MA · 2 networks
- SD / Comsat Southbury Ground StationSouthbury, CT · 1 networks
See all datacenter sites in Connecticut →
Dataset updated . Screening estimates derived from public data sources.
Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.