Pueblo is a natural gas plant in Pueblo, Pueblo, Colorado, retired 2013-12-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 23 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former usenatural gas plant
Site typeretired_plant
Existing capacity23 MW
Retirement date2013-12-01
EIA plant ID#460

Grid hookup & remediation

Nearest substation0.0 mi
Operator address105 S. Victoria, Pueblo, CO, 81003
Why this site is datacenter-attractive: a natural gas plant of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Site conditions & market — Pueblo County

County-level intelligence for this site's location — the power economics, water, hazard, connectivity, and workforce a developer screens before ever visiting. Assembled from FEMA NRI, BLS QCEW, FCC BDC, USGS water-use, and EIA.

Market & workforce

Total employment (laborshed)50,986
IT / tech employment40
Construction employment4,196
Land value$1,659/acre
Datacenter tax incentivesales_tax_exemption

Power economics & interconnection

Commercial power rate13.62¢/kWh
Industrial power rate9.08¢/kWh
Load growth (FERC-714)1.4%

Water & cooling

Water stressHigh
Public water supply41.3 MGD
Industrial water use32.7 MGD
Cooling degree days700
Mean annual temp46°F

Hazard, flood & connectivity

FEMA risk index25.0 · Relatively Moderate
Fiber providers8 · 67% served

County-level context — address-level utility offerings and flood zoning vary within the county. Confirm site-specific service with the utility and a Phase I ESA.

Nearby brownfield & retired-generation sites

A proximity screen of other retired-plant, contaminated, and EPA-flagged sites near Pueblo — the environmental neighborhood, ranked by legacy grid capacity.

SiteFormer useLegacy MWDistanceCleanup status
Comanche (CO)coal plant3834.6 mi—
Pueblo Airport Generating Stationnatural gas plant1006.1 mi—

Derived from GridCensus's retired-generator & EPA brownfield dataset. Not a substitute for an ASTM E1527 Phase I environmental radius report.

Get alerts

Track Pueblo

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Nearby datacenter candidate sites

Scored candidate sites near Pueblo, ranked by DC Readiness.

Candidate sites near Pueblo
SiteTypeStateCountyVoltageCapacityQueue waitScore
COMANCHESubstation-AdjacentCOPueblo County345 kV600 MW6.9 yrs64.5
MIDWAYSubstation-AdjacentCOEl Paso County345 kV600 MW6.9 yrs64.0
UNKNOWN201277Substation-AdjacentCOEl Paso County230 kV300 MW6.9 yrs63.5
EC Near Pueblo Airport Generating StationGreenfieldCOPueblo——1.7 yrs61.2
OZ PuebloGreenfieldCOPueblo——1.7 yrs61.0
EC Near Pueblo Airport Generating StationGreenfieldCOPueblo——1.7 yrs60.9
EC Near Pueblo Airport Generating StationGreenfieldCOPueblo——1.7 yrs60.5
BOONESubstation-AdjacentCOPueblo County230 kV300 MW6.9 yrs60.0

Nearby internet exchanges

See all datacenter sites in Colorado →

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Pueblo, Pueblo, Pueblo, Colorado. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.