Navajo

Brownfield

Page, Coconino, Arizona · Salt River Project

Legacy capacity
2,409
MW

Navajo is a coal plant in Page, Coconino, Arizona, retired 2019-11-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 2,409 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former usecoal plant
Site typeretired_plant
Existing capacity2,409 MW
Retirement date2019-11-01
EIA plant ID#4941

Grid hookup & remediation

Nearest substation0.4 mi
OperatorSalt River Project
Operator addressP.O. Box 850, Page, AZ, 86040
Why this site is datacenter-attractive: a coal plant of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Nearby datacenter candidate sites

Scored candidate sites near Navajo, ranked by DC Readiness.

Candidate sites near Navajo
SiteTypeStateCountyVoltageCapacityQueue waitScore
NAVAJOSubstation-AdjacentUTKane County500 kV1,000 MW5.7 yrs71.1
GLEN CANYONSubstation-AdjacentUTKane County345 kV600 MW5.7 yrs63.9
Greenfield (NAVAJO - DUGAS)GreenfieldUTKane County500 kV1,000 MW5.7 yrs62.3
Greenfield (NAVAJO - DUGAS)GreenfieldUTKane County500 kV1,000 MW5.7 yrs60.8
Greenfield (MOENKOPI - NAVAJO)GreenfieldUTKane County500 kV1,000 MW5.7 yrs60.8
Greenfield (MOENKOPI - NAVAJO)GreenfieldUTKane County500 kV1,000 MW5.7 yrs60.5
Greenfield (MOENKOPI - NAVAJO)GreenfieldUTKane County500 kV1,000 MW5.7 yrs59.2
Greenfield (NAVAJO - CRYSTAL)GreenfieldUTKane County500 kV1,000 MW5.7 yrs59.1

See all datacenter sites in Arizona

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Navajo, Page, Coconino, Arizona. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.