TAP209506
SubstationWyoming · PACIFICORP
At a glance
TAP209506 is an electric transmission substation in Wyoming, on PACIFICORP's transmission network. It is classified as distribution (<69 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #211738 | 35 kV | PACIFICORP | — | 8.3 mi |
| #211739 | 35 kV | PACIFICORP | — | 0.2 mi |
| #211740 | 35 kV | PACIFICORP | — | 19.1 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of TAP209506, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| SEMINOE | Substation-Adjacent | WY | Carbon County | 230 kV | 300 MW | 4.3 yrs | 58.7 |
| UNKNOWN201479 | Substation-Adjacent | WY | Carbon County | 230 kV | 300 MW | 4.3 yrs | 58.6 |
| UNKNOWN202491 | Substation-Adjacent | WY | Carbon County | 230 kV | 300 MW | 4.3 yrs | 58.3 |
| FREMONT CANYON | Substation-Adjacent | WY | Natrona County | 230 kV | 300 MW | 4.3 yrs | 57.7 |
| EC Near Sinclair Oil Refinery | Greenfield | WY | Carbon | — | — | 3.5 yrs | 56.2 |
| EC Near Sinclair Oil Refinery | Greenfield | WY | Carbon | — | — | 3.5 yrs | 55.9 |
| OZ Carbon | Greenfield | WY | Carbon | — | — | 3.5 yrs | 55.7 |
| EC Near Sinclair Oil Refinery | Greenfield | WY | Carbon | — | — | 3.5 yrs | 55.6 |
Who owns the transmission lines at TAP209506?
The 3 connected lines listed above are owned by PACIFICORP. Line voltages range from 35 kV to 35 kV. Their combined recorded length is about 27.6 miles.
How do candidate sites near TAP209506 score?
The 8 highest-scoring candidate sites within about 25 miles range from 56 to 59 on the 0–100 DC Readiness scale. They fall in Carbon County, Natrona County, Carbon. The Wyoming average across 1,639 scored sites is 52.2. 441 of those Wyoming sites are classed as substation sites (candidate locations generated at an existing substation).
Frequently asked questions
What voltage is TAP209506 substation?
TAP209506 has a maximum voltage of 35 kV. That places it in the below 69 kV band. The median named US substation in this dataset is 115 kV, so TAP209506 is below the national midpoint.
How many transmission lines connect to TAP209506 substation?
3 transmission lines terminate at or pass through TAP209506 in the HIFLD line data. The connected lines listed here run at 35 kV. Together the listed lines cover about 27.6 miles.
Who owns TAP209506 substation?
HIFLD does not publish substation owners directly. Most of the transmission lines that end at TAP209506 belong to PACIFICORP. GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.
Where is TAP209506 substation located?
TAP209506 is in Wyoming at 42.1989, -107.1840. The datacenter candidate sites closest to it are in Carbon County, Natrona County, Carbon.
Are there datacenter candidate sites near TAP209506 substation?
GridCensus lists at least 8 scored candidate sites within roughly 25 miles of TAP209506. The highest-scoring is SEMINOE at 59/100. Across Wyoming, the average DC Readiness score is 52.2.
More in Wyoming
About this data
Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.
Cite as: GridCensus, “TAP209506 substation, Wyoming”, https://gridcensus.com/substations/wyoming/tap209506-5b6cbe39 (data as of June 29, 2026).
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
Every site and score for TAP209506 substation, Wyoming is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.