TAP209500 is an electric transmission substation in Wyoming. It is classified as distribution (<69 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage35 kV
Min voltage35 kV
Voltage classDistribution (<69 kV)
Connected lines3

Ownership & operation

Operator not catalogued for this substation.

StateWyoming
Coordinates42.2387, -107.5706

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP209500, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP209500 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
EC Near Sinclair Oil RefineryGreenfieldWYCarbon——3.5 yrs55.6
MUSTANGSubstation-AdjacentWYSweetwater County230 kV300 MW3.5 yrs54.0
TAP204115Substation-AdjacentWYCarbon County230 kV300 MW3.5 yrs53.9
TAP205653Substation-AdjacentWYCarbon County230 kV300 MW3.5 yrs53.1
UNKNOWN202382Substation-AdjacentWYFremont County69 kV50 MW4.3 yrs48.9
BAIROILSubstation-AdjacentWYCarbon County115 kV100 MW3.5 yrs48.7
UNKNOWN209497Substation-AdjacentWYCarbon County69 kV50 MW3.5 yrs46.7
Mine SiteFormer MineWYFremont County——4.3 yrs45.9

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for TAP209500 substation, Wyoming is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.