BITTER CREEK

Substation

Wyoming

Max voltage
230
kV

BITTER CREEK is an electric transmission substation in Wyoming. It is classified as high-voltage (230 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage230 kV
Voltage classHigh-voltage (230 kV)
Connected lines3

Ownership & operation

Operator not catalogued for this substation.

StateWyoming
Coordinates41.6161, -108.5243

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of BITTER CREEK, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near BITTER CREEK substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
EC Coal Sweetwater CountyGreenfieldWYSweetwater County1.7 yrs58.5
JIM BRIDGERSubstation-AdjacentWYSweetwater County345 kV600 MW6.9 yrs55.7
UNKNOWN202468Substation-AdjacentWYSweetwater County230 kV300 MW6.9 yrs53.9
BITTER CREEKSubstation-AdjacentWYSweetwater County230 kV300 MW6.9 yrs53.9
BAR XSubstation-AdjacentWYSweetwater County230 kV300 MW6.9 yrs53.9
POINT OF ROCKSSubstation-AdjacentWYSweetwater County230 kV300 MW6.9 yrs53.9
UNKNOWN209494Substation-AdjacentWYSweetwater County115 kV100 MW6.9 yrs49.5
UNKNOWN209496Substation-AdjacentWYSweetwater County115 kV100 MW6.9 yrs49.5

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for BITTER CREEK substation, Wyoming. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.