Skip to content
Gridcensus

LOWER GRANITE

Substation

Washington

Max voltage
500
kV

LOWER GRANITE is an electric transmission substation in Washington. It is classified as extra-high-voltage (500 kv) and connects 4 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage500 kV
Min voltage500 kV
Voltage classExtra-high-voltage (500 kV)
Connected lines4

Ownership & operation

Operator not catalogued for this substation.

Coordinates46.6518, -117.4199

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of LOWER GRANITE, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near LOWER GRANITE substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
LOWER GRANITESubstation-AdjacentWAGarfield County500 kV1,000 MW6.9 yrs65.2
CENTRAL FERRYSubstation-AdjacentWAGarfield County500 kV1,000 MW6.9 yrs65.1
SHAWNEESubstation-AdjacentWAWhitman County230 kV300 MW6.9 yrs61.8
EC Near Washington State UniversityGreenfieldWAWhitman——1.7 yrs61.5
EC Near Washington State UniversityGreenfieldWAWhitman——1.7 yrs61.2
EC Near Washington State UniversityGreenfieldWAWhitman——1.7 yrs60.9
NORTH LEWISTONSubstation-AdjacentIDNez Perce County230 kV300 MW6.9 yrs60.8
EC Near Washington State UniversityGreenfieldWAWhitman——1.7 yrs60.8

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for LOWER GRANITE substation, Washington. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.