LEXINGTON is an electric transmission substation in Washington. It is classified as high-voltage (230 kv) and connects 8 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage69 kV
Voltage classHigh-voltage (230 kV)
Connected lines8

Ownership & operation

Operator not catalogued for this substation.

Coordinates46.1819, -122.9132

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of LEXINGTON, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near LEXINGTON substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
ALLSTONSubstation-AdjacentORColumbia County500 kV1,000 MW3.5 yrs63.6
EC Near Longview FibreGreenfieldWACowlitz——3.5 yrs60.1
WOODLANDSubstation-AdjacentWAClark County230 kV300 MW3.5 yrs59.9
PORT WESTWARDSubstation-AdjacentORWahkiakum County230 kV300 MW3.5 yrs59.7
MINT FARMSubstation-AdjacentWAColumbia County230 kV300 MW3.5 yrs59.4
TAP203174Substation-AdjacentWAColumbia County230 kV300 MW3.5 yrs59.4
TROJAN NUCLEAR PLANT SWITCHYARDSubstation-AdjacentORColumbia County230 kV300 MW3.5 yrs59.4
LEXINGTONSubstation-AdjacentWACowlitz County230 kV300 MW3.5 yrs59.4

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for LEXINGTON substation, Washington is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.