Skip to content
Gridcensus

TAP209636

Substation

Utah · UTAH MUNICIPAL POWER AGENCY

Max voltage
69
kV

At a glance

TAP209636 is a 69 kV electric substation in Utah on UTAH MUNICIPAL POWER AGENCY's transmission network, recorded in the HIFLD transmission dataset. 2 transmission lines connect to it. The highest-scoring datacenter candidate site within about 25 miles is Spanish Fork Landfill in Utah, with a DC Readiness score of 64/100.

TAP209636 is an electric transmission substation in Utah, on UTAH MUNICIPAL POWER AGENCY's transmission network. It is classified as distribution (69–115 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage69 kV
Min voltage69 kV
Voltage classDistribution (69–115 kV)
Connected lines2

Ownership

Line owner (most lines)UTAH MUNICIPAL POWER AGENCY
StateUtah
Coordinates39.7217, -111.8412

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#21191969 kVUTAH MUNICIPAL POWER AGENCYIN SERVICE0.8 mi
#21192069 kVUTAH MUNICIPAL POWER AGENCYIN SERVICE0.0 mi
#21192169 kVUTAH MUNICIPAL POWER AGENCYIN SERVICE0.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP209636, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP209636 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
Spanish Fork LandfillBrownfieldUTUtah115 kV5 MW3.5 yrs63.7
SPANISH FORKSubstation-AdjacentUTUtah County345 kV600 MW3.5 yrs63.0
MONASubstation-AdjacentUTUtah County345 kV600 MW3.5 yrs61.5
EC Near PaysonGreenfieldUTUtah——3.5 yrs61.2
EC Near PaysonGreenfieldUTUtah——3.5 yrs61.0
CLOVERSubstation-AdjacentUTUtah County345 kV600 MW3.5 yrs60.7
EC Near PaysonGreenfieldUTUtah——3.5 yrs60.6
EC Near PaysonGreenfieldUTUtah——3.5 yrs60.5

Who owns the transmission lines at TAP209636?

The 3 connected lines listed above are owned by UTAH MUNICIPAL POWER AGENCY. Line voltages range from 69 kV to 69 kV. Their combined recorded length is about 0.9 miles.

How do candidate sites near TAP209636 score?

The 8 highest-scoring candidate sites within about 25 miles range from 61 to 64 on the 0–100 DC Readiness scale. They fall in Utah, Utah County. The Utah average across 2,458 scored sites is 51.7. 739 of those Utah sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

What voltage is TAP209636 substation?

TAP209636 has a maximum voltage of 69 kV. That places it in the 69–114 kV band. The median named US substation in this dataset is 115 kV, so TAP209636 is below the national midpoint.

How many transmission lines connect to TAP209636 substation?

2 transmission lines terminate at or pass through TAP209636 in the HIFLD line data. The connected lines listed here run at 69 kV. Together the listed lines cover about 0.9 miles.

Who owns TAP209636 substation?

HIFLD does not publish substation owners directly. Most of the transmission lines that end at TAP209636 belong to UTAH MUNICIPAL POWER AGENCY. GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.

Where is TAP209636 substation located?

TAP209636 is in Utah at 39.7217, -111.8412. The datacenter candidate sites closest to it are in Utah, Utah County.

Are there datacenter candidate sites near TAP209636 substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of TAP209636. The highest-scoring is Spanish Fork Landfill at 64/100. Across Utah, the average DC Readiness score is 51.7.

More in Utah

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “TAP209636 substation, Utah”, https://gridcensus.com/substations/utah/tap209636-e5f29421 (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for TAP209636 substation, Utah is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.