TAP206731
SubstationUtah · HEBER LIGHT AND POWER COMPANY
At a glance
TAP206731 is an electric transmission substation in Utah, on HEBER LIGHT AND POWER COMPANY's transmission network. It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #207540 | 138 kV | HEBER LIGHT AND POWER COMPANY | — | 0.0 mi |
| #207541 | 138 kV | HEBER LIGHT AND POWER COMPANY | — | 0.7 mi |
| #207542 | 138 kV | HEBER LIGHT AND POWER COMPANY | — | 0.5 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of TAP206731, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| LAKESIDE 2 | Substation-Adjacent | UT | Utah County | 345 kV | 600 MW | 3.5 yrs | 66.1 |
| Spanish Fork Landfill | Brownfield | UT | Utah | 115 kV | 5 MW | 3.5 yrs | 63.7 |
| UNKNOWN205955 | Substation-Adjacent | UT | Wasatch County | 345 kV | 600 MW | 3.5 yrs | 61.8 |
| EC Near Payson | Greenfield | UT | Utah | — | — | 3.5 yrs | 61.7 |
| EC Near Bountiful City | Greenfield | UT | Davis | — | — | 3.5 yrs | 61.5 |
| EC Near Bountiful City | Greenfield | UT | Davis | — | — | 3.5 yrs | 61.4 |
| EC Near Murray City | Greenfield | UT | Salt Lake | — | — | 3.5 yrs | 61.2 |
| TAP206729 | Substation-Adjacent | UT | Wasatch County | 345 kV | 600 MW | 3.5 yrs | 60.9 |
Who owns the transmission lines at TAP206731?
The 3 connected lines listed above are owned by HEBER LIGHT AND POWER COMPANY. Line voltages range from 138 kV to 138 kV. Their combined recorded length is about 1.2 miles.
How do candidate sites near TAP206731 score?
The 8 highest-scoring candidate sites within about 25 miles range from 61 to 66 on the 0–100 DC Readiness scale. They fall in Utah County, Utah, Wasatch County, Davis. The Utah average across 2,458 scored sites is 51.7. 739 of those Utah sites are classed as substation sites (candidate locations generated at an existing substation).
Frequently asked questions
What voltage is TAP206731 substation?
TAP206731 has a maximum voltage of 138 kV. That places it in the 115–229 kV band. The median named US substation in this dataset is 115 kV, so TAP206731 is above the national midpoint.
How many transmission lines connect to TAP206731 substation?
3 transmission lines terminate at or pass through TAP206731 in the HIFLD line data. The connected lines listed here run at 138 kV. Together the listed lines cover about 1.2 miles.
Who owns TAP206731 substation?
HIFLD does not publish substation owners directly. Most of the transmission lines that end at TAP206731 belong to HEBER LIGHT AND POWER COMPANY. GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.
Where is TAP206731 substation located?
TAP206731 is in Utah at 40.4979, -111.4210. The datacenter candidate sites closest to it are in Utah County, Utah, Wasatch County.
Are there datacenter candidate sites near TAP206731 substation?
GridCensus lists at least 8 scored candidate sites within roughly 25 miles of TAP206731. The highest-scoring is LAKESIDE 2 at 66/100. Across Utah, the average DC Readiness score is 51.7.
More in Utah
About this data
Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.
Cite as: GridCensus, “TAP206731 substation, Utah”, https://gridcensus.com/substations/utah/tap206731-137effd7 (data as of June 29, 2026).
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
Every site and score for TAP206731 substation, Utah is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.