ANADARDKO-CHAPITA
SubstationUtah · MOON LAKE ELECTRIC ASSN INC
At a glance
ANADARDKO-CHAPITA is an electric transmission substation in Utah, on MOON LAKE ELECTRIC ASSN INC's transmission network. It is classified as sub-transmission (138 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #205382 | 138 kV | MOON LAKE ELECTRIC ASSN INC | — | 8.6 mi |
| #211899 | 69 kV | MOON LAKE ELECTRIC ASSN INC | IN SERVICE | 0.6 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of ANADARDKO-CHAPITA, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| BONANZA | Substation-Adjacent | UT | Uintah County | 345 kV | 600 MW | 4.3 yrs | 62.2 |
| EC Near Bonanza | Greenfield | UT | Uintah | — | — | 4.3 yrs | 60.7 |
| EC Near Bonanza | Greenfield | UT | Uintah | — | — | 4.3 yrs | 59.3 |
| EC Near Bonanza | Greenfield | UT | Uintah | — | — | 4.3 yrs | 58.9 |
| VERNAL | Substation-Adjacent | UT | Uintah County | 138 kV | 100 MW | 4.3 yrs | 58.7 |
| EC Near Bonanza | Greenfield | UT | Uintah | — | — | 4.3 yrs | 58.6 |
| EC Near Bonanza | Greenfield | UT | Uintah | — | — | 4.3 yrs | 58.3 |
| UNKNOWN209679 | Substation-Adjacent | UT | Uintah County | 69 kV | 50 MW | 4.3 yrs | 57.7 |
How does ANADARDKO-CHAPITA compare with other substations in Utah?
Utah has 1,404 substation records in HIFLD, of which 243 carry a station name; the rest are unnamed tap points, risers and line ends. 112 named substations in the state are in ANADARDKO-CHAPITA's 115–229 kV band (46% of named stations). 38 sit in a higher band. 22 named substations in Utah operate at 345 kV or above. The highest voltage recorded in the state is 500 kV, and the state median is 138 kV.
Who owns the transmission lines at ANADARDKO-CHAPITA?
The 2 connected lines listed above are owned by MOON LAKE ELECTRIC ASSN INC. Line voltages range from 69 kV to 138 kV. Their combined recorded length is about 9.2 miles.
How do candidate sites near ANADARDKO-CHAPITA score?
The 8 highest-scoring candidate sites within about 25 miles range from 58 to 62 on the 0–100 DC Readiness scale. They fall in Uintah County, Uintah. The Utah average across 2,458 scored sites is 51.7. 739 of those Utah sites are classed as substation sites (candidate locations generated at an existing substation).
Frequently asked questions
What voltage is ANADARDKO-CHAPITA substation?
ANADARDKO-CHAPITA has a maximum voltage of 138 kV and a minimum of 69 kV. That places it in the 115–229 kV band. The median named US substation in this dataset is 115 kV, so ANADARDKO-CHAPITA is above the national midpoint.
How many transmission lines connect to ANADARDKO-CHAPITA substation?
2 transmission lines terminate at or pass through ANADARDKO-CHAPITA in the HIFLD line data. The connected lines listed here run at 138 kV, 69 kV. Together the listed lines cover about 9.2 miles.
Who owns ANADARDKO-CHAPITA substation?
HIFLD does not publish substation owners directly. Most of the transmission lines that end at ANADARDKO-CHAPITA belong to MOON LAKE ELECTRIC ASSN INC. GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.
Where is ANADARDKO-CHAPITA substation located?
ANADARDKO-CHAPITA is in Utah at 40.0389, -109.4198. The datacenter candidate sites closest to it are in Uintah County, Uintah.
Are there datacenter candidate sites near ANADARDKO-CHAPITA substation?
GridCensus lists at least 8 scored candidate sites within roughly 25 miles of ANADARDKO-CHAPITA. The highest-scoring is BONANZA at 62/100. Across Utah, the average DC Readiness score is 51.7.
Other 138 kV substations in Utah
About this data
Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.
Cite as: GridCensus, “ANADARDKO-CHAPITA substation, Utah”, https://gridcensus.com/substations/utah/anadardko-chapita-cba0781f (data as of June 29, 2026).
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
Every site and score for ANADARDKO-CHAPITA substation, Utah is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.