Skip to content
Gridcensus

TUCO

Substation

Texas

Max voltage
345
kV

TUCO is an electric transmission substation in Texas. It is classified as high-voltage (345 kv) and connects 11 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage345 kV
Min voltage14 kV
Voltage classHigh-voltage (345 kV)
Connected lines11

Ownership & operation

Operator not catalogued for this substation.

StateTexas
Coordinates33.8691, -101.8434

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TUCO, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TUCO substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
EC Near J Robert MassengaleGreenfieldTXLubbock3.4 yrs62.5
OZ LubbockGreenfieldTXLubbock3.4 yrs62.4
EC Near Brandon StationGreenfieldTXLubbock3.4 yrs60.1
OZ LubbockGreenfieldTXLubbock3.4 yrs60.0
EC Near Brandon StationGreenfieldTXLubbock3.4 yrs60.0
UNKNOWN300970Substation-AdjacentTXLubbock County345 kV600 MW1.7 yrs59.6
EC Near Brandon StationGreenfieldTXLubbock3.4 yrs59.2
UNKNOWN306378Substation-AdjacentTXLubbock County345 kV600 MW1.7 yrs58.8

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TUCO substation, Texas. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.