Skip to content
Gridcensus

TAP310839

Substation

Texas · ONCOR ELECTRIC DELIVERY CO.

Max voltage
138
kV

At a glance

TAP310839 is a 138 kV electric substation in Texas on ONCOR ELECTRIC DELIVERY CO.'s transmission network, recorded in the HIFLD transmission dataset. 4 transmission lines connect to it. The highest-scoring datacenter candidate site within about 25 miles is MOSS SWITCHYARD in Ector County, with a DC Readiness score of 62/100.

TAP310839 is an electric transmission substation in Texas, on ONCOR ELECTRIC DELIVERY CO.'s transmission network. It is classified as sub-transmission (138 kv) and connects 4 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage138 kV
Min voltage138 kV
Voltage classSub-transmission (138 kV)
Connected lines4

Ownership

Line owner (most lines)ONCOR ELECTRIC DELIVERY CO.
StateTexas
Coordinates31.7336, -102.5331

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#301586138 kVONCOR ELECTRIC DELIVERY CO.IN SERVICE15.0 mi
#301587138 kVONCOR ELECTRIC DELIVERY CO.IN SERVICE6.4 mi
#309700138 kVONCOR ELECTRIC DELIVERY CO.IN SERVICE3.9 mi
#313228138 kVONCOR ELECTRIC DELIVERY CO.IN SERVICE1.5 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP310839, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP310839 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
MOSS SWITCHYARDSubstation-AdjacentTXEctor County345 kV600 MW3.5 yrs61.6
ODESSASubstation-AdjacentTXEctor County345 kV600 MW3.5 yrs60.9
UNKNOWN306186Substation-AdjacentTXEctor County345 kV600 MW3.5 yrs60.9
UNKNOWN310183Substation-AdjacentTXEctor County345 kV600 MW3.5 yrs60.9
UNKNOWN300550Substation-AdjacentTXEctor County345 kV600 MW3.5 yrs60.4
UNKNOWN305503Substation-AdjacentTXEctor County345 kV600 MW3.5 yrs59.7
EC Near Permian BasinGreenfieldTXWard——3.5 yrs59.1
EC Near Permian BasinGreenfieldTXWard——3.5 yrs58.5

Who owns the transmission lines at TAP310839?

The 4 connected lines listed above are owned by ONCOR ELECTRIC DELIVERY CO. Line voltages range from 138 kV to 138 kV. Their combined recorded length is about 26.9 miles.

How do candidate sites near TAP310839 score?

The 8 highest-scoring candidate sites within about 25 miles range from 59 to 62 on the 0–100 DC Readiness scale. They fall in Ector County, Ward. The Texas average across 6,839 scored sites is 56.4. 3,635 of those Texas sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

What voltage is TAP310839 substation?

TAP310839 has a maximum voltage of 138 kV. That places it in the 115–229 kV band. The median named US substation in this dataset is 115 kV, so TAP310839 is above the national midpoint.

How many transmission lines connect to TAP310839 substation?

4 transmission lines terminate at or pass through TAP310839 in the HIFLD line data. The connected lines listed here run at 138 kV. Together the listed lines cover about 26.9 miles.

Who owns TAP310839 substation?

HIFLD does not publish substation owners directly. Most of the transmission lines that end at TAP310839 belong to ONCOR ELECTRIC DELIVERY CO. GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.

Where is TAP310839 substation located?

TAP310839 is in Texas at 31.7336, -102.5331. The datacenter candidate sites closest to it are in Ector County, Ward.

Are there datacenter candidate sites near TAP310839 substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of TAP310839. The highest-scoring is MOSS SWITCHYARD at 62/100. Across Texas, the average DC Readiness score is 56.4.

More in Texas

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “TAP310839 substation, Texas”, https://gridcensus.com/substations/texas/tap310839-1f6e10ec (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for TAP310839 substation, Texas is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.