TAP310794

Substation

Texas · CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC

Max voltage
138
kV

At a glance

TAP310794 is a 138 kV electric substation in Texas on CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC's transmission network, recorded in the HIFLD transmission dataset. 3 transmission lines connect to it. The highest-scoring datacenter candidate site within about 25 miles is Freeport Energy in Brazoria County, with a DC Readiness score of 70/100.

TAP310794 is an electric transmission substation in Texas, on CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC's transmission network. It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage138 kV
Min voltage138 kV
Voltage classSub-transmission (138 kV)
Connected lines3

Ownership

StateTexas
Coordinates28.9833, -95.3580

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#304261138 kVCENTERPOINT ENERGY HOUSTON ELECTRIC, LLCIN SERVICE0.2 mi
#308587138 kVCENTERPOINT ENERGY HOUSTON ELECTRIC, LLCIN SERVICE3.0 mi
#311872138 kVCENTERPOINT ENERGY HOUSTON ELECTRIC, LLCIN SERVICE1.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP310794, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP310794 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
Freeport EnergyBrownfieldTXBrazoria County138 kV776 MW3.5 yrs69.9
DOW VELASCOSubstation-AdjacentTXBrazoria County345 kV600 MW3.5 yrs64.3
CAVERNSubstation-AdjacentTXBrazoria County345 kV600 MW3.5 yrs64.2
UNKNOWN307821Substation-AdjacentTXBrazoria County345 kV600 MW3.5 yrs64.1
Ascend Performance Materials Texas Inc.BrownfieldTXBrazoria138 kV3 MW3.5 yrs62.4
EC Near Coastal PlainsGreenfieldTXGalveston——3.5 yrs61.5
EC Near Ascend Performance Materials Texas Inc.GreenfieldTXBrazoria——3.5 yrs61.1
EC Near Freeport Energy CenterGreenfieldTXBrazoria——3.5 yrs60.4

Who owns the transmission lines at TAP310794?

The 3 connected lines listed above are owned by CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC. Line voltages range from 138 kV to 138 kV. Their combined recorded length is about 4.2 miles.

How do candidate sites near TAP310794 score?

The 8 highest-scoring candidate sites within about 25 miles range from 60 to 70 on the 0–100 DC Readiness scale. They fall in Brazoria County, Brazoria, Galveston. The Texas average across 6,839 scored sites is 56.4. 3,635 of those Texas sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

What voltage is TAP310794 substation?

TAP310794 has a maximum voltage of 138 kV. That places it in the 115–229 kV band. The median named US substation in this dataset is 115 kV, so TAP310794 is above the national midpoint.

How many transmission lines connect to TAP310794 substation?

3 transmission lines terminate at or pass through TAP310794 in the HIFLD line data. The connected lines listed here run at 138 kV. Together the listed lines cover about 4.2 miles.

Who owns TAP310794 substation?

HIFLD does not publish substation owners directly. Most of the transmission lines that end at TAP310794 belong to CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC. GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.

Where is TAP310794 substation located?

TAP310794 is in Texas at 28.9833, -95.3580. The datacenter candidate sites closest to it are in Brazoria County, Brazoria, Galveston.

Are there datacenter candidate sites near TAP310794 substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of TAP310794. The highest-scoring is Freeport Energy at 70/100. Across Texas, the average DC Readiness score is 56.4.

More in Texas

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “TAP310794 substation, Texas”, https://gridcensus.com/substations/texas/tap310794-2a1c20b5 (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for TAP310794 substation, Texas is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.