TAP310732

Substation

Texas · BROWNSVILLE PUBLIC UTILITIES BOARD

Max voltage
138
kV

At a glance

TAP310732 is a 138 kV electric substation in Texas on BROWNSVILLE PUBLIC UTILITIES BOARD's transmission network, recorded in the HIFLD transmission dataset. 3 transmission lines connect to it. The highest-scoring datacenter candidate site within about 25 miles is Aegle Power in Cameron County, with a DC Readiness score of 71/100.

TAP310732 is an electric transmission substation in Texas, on BROWNSVILLE PUBLIC UTILITIES BOARD's transmission network. It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage138 kV
Min voltage138 kV
Voltage classSub-transmission (138 kV)
Connected lines3

Ownership

Line owner (most lines)BROWNSVILLE PUBLIC UTILITIES BOARD
StateTexas
Coordinates25.9412, -97.4698

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#306059138 kV—IN SERVICE0.8 mi
#309138138 kVBROWNSVILLE PUBLIC UTILITIES BOARDIN SERVICE6.6 mi
#312439138 kVBROWNSVILLE PUBLIC UTILITIES BOARDIN SERVICE1.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP310732, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP310732 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
Aegle PowerBrownfieldTXCameron County138 kV1,282 MW3.5 yrs71.4
UNKNOWN305746Substation-AdjacentTXCameron County345 kV600 MW3.5 yrs68.6
RIO HONDOSubstation-AdjacentTXWillacy County345 kV600 MW3.5 yrs68.3
EC Near Aegle PowerGreenfieldTXCameron——3.5 yrs66.2
OZ CameronGreenfieldTXCameron——3.5 yrs65.7
OZ CameronGreenfieldTXCameron——3.5 yrs64.0
Rio Grande Valley Sugar GrowersBrownfieldTXHidalgo County115 kV25 MW3.5 yrs64.0
UNKNOWN306206Substation-AdjacentTXCameron County138 kV100 MW3.5 yrs63.7

Who owns the transmission lines at TAP310732?

The 3 connected lines listed above are owned by BROWNSVILLE PUBLIC UTILITIES BOARD. Line voltages range from 138 kV to 138 kV. Their combined recorded length is about 8.5 miles.

How do candidate sites near TAP310732 score?

The 8 highest-scoring candidate sites within about 25 miles range from 64 to 71 on the 0–100 DC Readiness scale. They fall in Cameron County, Willacy County, Cameron, Hidalgo County. The Texas average across 6,839 scored sites is 56.4. 3,635 of those Texas sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

What voltage is TAP310732 substation?

TAP310732 has a maximum voltage of 138 kV. That places it in the 115–229 kV band. The median named US substation in this dataset is 115 kV, so TAP310732 is above the national midpoint.

How many transmission lines connect to TAP310732 substation?

3 transmission lines terminate at or pass through TAP310732 in the HIFLD line data. The connected lines listed here run at 138 kV. Together the listed lines cover about 8.5 miles.

Who owns TAP310732 substation?

HIFLD does not publish substation owners directly. Most of the transmission lines that end at TAP310732 belong to BROWNSVILLE PUBLIC UTILITIES BOARD. GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.

Where is TAP310732 substation located?

TAP310732 is in Texas at 25.9412, -97.4698. The datacenter candidate sites closest to it are in Cameron County, Willacy County, Cameron.

Are there datacenter candidate sites near TAP310732 substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of TAP310732. The highest-scoring is Aegle Power at 71/100. Across Texas, the average DC Readiness score is 56.4.

More in Texas

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “TAP310732 substation, Texas”, https://gridcensus.com/substations/texas/tap310732-0d644503 (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for TAP310732 substation, Texas is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.