TAP310660
SubstationTexas · ONCOR ELECTRIC DELIVERY CO.
At a glance
TAP310660 is an electric transmission substation in Texas, operated by ONCOR ELECTRIC DELIVERY CO.. It is classified as distribution (69–115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #302045 | 138 kV | ONCOR ELECTRIC DELIVERY CO. | IN SERVICE | 2.9 mi |
| #302854 | 138 kV | ONCOR ELECTRIC DELIVERY CO. | — | 9.9 mi |
| #311178 | 138 kV | ONCOR ELECTRIC DELIVERY CO. | — | 13.5 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of TAP310660, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| PERMIAN BASIN 345 | Substation-Adjacent | TX | Ward County | 345 kV | 600 MW | 3.5 yrs | 64.6 |
| UNKNOWN300550 | Substation-Adjacent | TX | Ector County | 345 kV | 600 MW | 3.5 yrs | 60.4 |
| EC Near Permian Basin | Greenfield | TX | Ward | — | — | 3.5 yrs | 59.1 |
| EC Near Permian Basin | Greenfield | TX | Ward | — | — | 3.5 yrs | 58.5 |
| EC Near Permian Basin | Greenfield | TX | Ward | — | — | 3.5 yrs | 58.0 |
| EC Near Permian Basin | Greenfield | TX | Ward | — | — | 3.5 yrs | 57.9 |
| EC Near Permian Basin | Greenfield | TX | Ward | — | — | 3.5 yrs | 57.2 |
| MIDWAY | Substation-Adjacent | TX | Winkler County | 138 kV | 100 MW | 3.5 yrs | 56.8 |
Who owns the transmission lines at TAP310660?
The 3 connected lines listed above are owned by ONCOR ELECTRIC DELIVERY CO. Line voltages range from 138 kV to 138 kV. Their combined recorded length is about 26.3 miles.
How do candidate sites near TAP310660 score?
The 8 highest-scoring candidate sites within about 25 miles range from 57 to 65 on the 0–100 DC Readiness scale. They fall in Ward County, Ector County, Ward, Winkler County. The Texas average across 6,839 scored sites is 56.4. 3,635 of those Texas sites are classed as substation sites (candidate locations generated at an existing substation).
Frequently asked questions
What voltage is TAP310660 substation?
TAP310660 has a maximum voltage of 69 kV. That places it in the 69–114 kV band. The median named US substation in this dataset is 115 kV, so TAP310660 is below the national midpoint.
How many transmission lines connect to TAP310660 substation?
3 transmission lines terminate at or pass through TAP310660 in the HIFLD line data. The connected lines listed here run at 138 kV. Together the listed lines cover about 26.3 miles.
Who owns TAP310660 substation?
HIFLD lists ONCOR ELECTRIC DELIVERY CO. as the operator of TAP310660.
Where is TAP310660 substation located?
TAP310660 is in Texas at 31.9146, -103.0013. The datacenter candidate sites closest to it are in Ward County, Ector County, Ward.
Are there datacenter candidate sites near TAP310660 substation?
GridCensus lists at least 8 scored candidate sites within roughly 25 miles of TAP310660. The highest-scoring is PERMIAN BASIN 345 at 65/100. Across Texas, the average DC Readiness score is 56.4.
More in Texas
About this data
Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.
Cite as: GridCensus, “TAP310660 substation, Texas”, https://gridcensus.com/substations/texas/tap310660-128f9769 (data as of June 29, 2026).
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
Every site and score for TAP310660 substation, Texas is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.