Skip to content
Gridcensus

TAP305245

Substation

Texas

Max voltage
69
kV

TAP305245 is an electric transmission substation in Texas. It is classified as distribution (69–115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage69 kV
Min voltage69 kV
Voltage classDistribution (69–115 kV)
Connected lines3

Ownership & operation

Operator not catalogued for this substation.

StateTexas
Coordinates32.2303, -95.8365

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP305245, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP305245 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
TRINIDADSubstation-AdjacentTXHenderson County345 kV600 MW3.5 yrs63.8
UNKNOWN300912Substation-AdjacentTXAnderson County345 kV600 MW3.5 yrs63.2
UNKNOWN307053Substation-AdjacentTXAnderson County345 kV600 MW3.5 yrs62.9
FOREST GROVESubstation-AdjacentTXHenderson County345 kV600 MW3.5 yrs62.8
RICHLAND CHAMBERS SWITCHING STATIONSubstation-AdjacentTXFreestone County345 kV600 MW3.5 yrs62.8
OZ HendersonGreenfieldTXHenderson——3.5 yrs62.7
EC FFE Van Zandt CountyGreenfieldTXVan Zandt County——3.5 yrs61.9
OZ HendersonGreenfieldTXHenderson——3.5 yrs61.5

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for TAP305245 substation, Texas is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.