TAP302724
SubstationTexas
TAP302724 is an electric transmission substation in Texas. It is classified as distribution (69–115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Ownership & operation
Operator not catalogued for this substation.
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of TAP302724, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| SAN ANGELO RED CREEK | Substation-Adjacent | TX | Tom Green County | 345 kV | 600 MW | 3.5 yrs | 64.0 |
| TWIN BUTTES | Substation-Adjacent | TX | Tom Green County | 345 kV | 600 MW | 3.5 yrs | 63.5 |
| OZ Tom Green | Greenfield | TX | Tom Green | — | — | 3.5 yrs | 61.0 |
| BIG HILL | Substation-Adjacent | TX | Schleicher County | 345 kV | 600 MW | 3.5 yrs | 60.9 |
| UNKNOWN301115 | Substation-Adjacent | TX | Tom Green County | 138 kV | 100 MW | 3.5 yrs | 58.3 |
| UNKNOWN301311 | Substation-Adjacent | TX | Tom Green County | 138 kV | 100 MW | 3.5 yrs | 58.2 |
| UNKNOWN308391 | Substation-Adjacent | TX | Tom Green County | 138 kV | 100 MW | 3.5 yrs | 58.2 |
| UNKNOWN303418 | Substation-Adjacent | TX | Tom Green County | 138 kV | 100 MW | 3.5 yrs | 58.2 |
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
Every site and score for TAP302724 substation, Texas is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.