TAP302703

Substation

Texas · ONCOR ELECTRIC DELIVERY CO.

Max voltage
—
kV

At a glance

TAP302703 is an electric substation in Texas on ONCOR ELECTRIC DELIVERY CO.'s transmission network, recorded in the HIFLD transmission dataset. 3 transmission lines connect to it. The highest-scoring datacenter candidate site within about 25 miles is TRINIDAD in Henderson County, with a DC Readiness score of 64/100.

TAP302703 is an electric transmission substation in Texas, on ONCOR ELECTRIC DELIVERY CO.'s transmission network. It is classified as unclassified and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Voltage classUnclassified
Connected lines3

Ownership

Line owner (most lines)ONCOR ELECTRIC DELIVERY CO.
StateTexas
Coordinates32.4724, -96.0228

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#300652138 kVONCOR ELECTRIC DELIVERY CO.IN SERVICE20.8 mi
#305708138 kV—IN SERVICE11.4 mi
#309905138 kVONCOR ELECTRIC DELIVERY CO.IN SERVICE0.5 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP302703, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP302703 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
TRINIDADSubstation-AdjacentTXHenderson County345 kV600 MW3.5 yrs63.8
OZ KaufmanGreenfieldTXKaufman——3.5 yrs63.7
FOREST GROVESubstation-AdjacentTXHenderson County345 kV600 MW3.5 yrs62.8
OZ HendersonGreenfieldTXHenderson——3.5 yrs62.7
UNKNOWN306597Substation-AdjacentTXKaufman County230 kV300 MW3.5 yrs62.3
EC FFE Van Zandt CountyGreenfieldTXVan Zandt County——3.5 yrs61.9
OZ HendersonGreenfieldTXHenderson——3.5 yrs61.5
EC FFE Kaufman CountyGreenfieldTXKaufman County——3.5 yrs61.1

Who owns the transmission lines at TAP302703?

The 3 connected lines listed above are owned by ONCOR ELECTRIC DELIVERY CO. Line voltages range from 138 kV to 138 kV. Their combined recorded length is about 32.6 miles.

How do candidate sites near TAP302703 score?

The 8 highest-scoring candidate sites within about 25 miles range from 61 to 64 on the 0–100 DC Readiness scale. They fall in Henderson County, Kaufman, Henderson, Kaufman County. The Texas average across 6,839 scored sites is 56.4. 3,635 of those Texas sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

How many transmission lines connect to TAP302703 substation?

3 transmission lines terminate at or pass through TAP302703 in the HIFLD line data. The connected lines listed here run at 138 kV. Together the listed lines cover about 32.6 miles.

Who owns TAP302703 substation?

HIFLD does not publish substation owners directly. Most of the transmission lines that end at TAP302703 belong to ONCOR ELECTRIC DELIVERY CO. GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.

Where is TAP302703 substation located?

TAP302703 is in Texas at 32.4724, -96.0228. The datacenter candidate sites closest to it are in Henderson County, Kaufman, Henderson.

Are there datacenter candidate sites near TAP302703 substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of TAP302703. The highest-scoring is TRINIDAD at 64/100. Across Texas, the average DC Readiness score is 56.4.

More in Texas

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “TAP302703 substation, Texas”, https://gridcensus.com/substations/texas/tap302703-ff6cb336 (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for TAP302703 substation, Texas is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.