TAP302632
SubstationTexas · ONCOR ELECTRIC DELIVERY CO.
At a glance
TAP302632 is an electric transmission substation in Texas, on ONCOR ELECTRIC DELIVERY CO.'s transmission network. It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #300468 | 138 kV | ONCOR ELECTRIC DELIVERY CO. | IN SERVICE | 14.0 mi |
| #303402 | 138 kV | ONCOR ELECTRIC DELIVERY CO. | — | 15.1 mi |
| #306934 | 138 kV | ONCOR ELECTRIC DELIVERY CO. | IN SERVICE | 0.1 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of TAP302632, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| UNKNOWN301484 | Substation-Adjacent | TX | Howard County | 345 kV | 600 MW | 3.5 yrs | 63.6 |
| UNKNOWN300682 | Substation-Adjacent | TX | Howard County | 345 kV | 600 MW | 3.5 yrs | 63.2 |
| UNKNOWN307631 | Substation-Adjacent | TX | Howard County | 345 kV | 600 MW | 3.5 yrs | 62.8 |
| UNKNOWN308253 | Substation-Adjacent | TX | Howard County | 345 kV | 600 MW | 3.5 yrs | 62.8 |
| OZ Howard | Greenfield | TX | Howard | — | — | 3.5 yrs | 62.1 |
| UNKNOWN309713 | Substation-Adjacent | TX | Martin County | 345 kV | 600 MW | 3.5 yrs | 61.9 |
| UNKNOWN310087 | Substation-Adjacent | TX | Martin County | 345 kV | 600 MW | 3.5 yrs | 61.6 |
| UNKNOWN303025 | Substation-Adjacent | TX | Midland County | 345 kV | 600 MW | 3.5 yrs | 61.3 |
Who owns the transmission lines at TAP302632?
The 3 connected lines listed above are owned by ONCOR ELECTRIC DELIVERY CO. Line voltages range from 138 kV to 138 kV. Their combined recorded length is about 29.3 miles.
How do candidate sites near TAP302632 score?
The 8 highest-scoring candidate sites within about 25 miles range from 61 to 64 on the 0–100 DC Readiness scale. They fall in Howard County, Howard, Martin County, Midland County. The Texas average across 6,839 scored sites is 56.4. 3,635 of those Texas sites are classed as substation sites (candidate locations generated at an existing substation).
Frequently asked questions
What voltage is TAP302632 substation?
TAP302632 has a maximum voltage of 138 kV. That places it in the 115–229 kV band. The median named US substation in this dataset is 115 kV, so TAP302632 is above the national midpoint.
How many transmission lines connect to TAP302632 substation?
3 transmission lines terminate at or pass through TAP302632 in the HIFLD line data. The connected lines listed here run at 138 kV. Together the listed lines cover about 29.3 miles.
Who owns TAP302632 substation?
HIFLD does not publish substation owners directly. Most of the transmission lines that end at TAP302632 belong to ONCOR ELECTRIC DELIVERY CO. GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.
Where is TAP302632 substation located?
TAP302632 is in Texas at 31.9030, -101.7147. The datacenter candidate sites closest to it are in Howard County, Howard, Martin County.
Are there datacenter candidate sites near TAP302632 substation?
GridCensus lists at least 8 scored candidate sites within roughly 25 miles of TAP302632. The highest-scoring is UNKNOWN301484 at 64/100. Across Texas, the average DC Readiness score is 56.4.
More in Texas
About this data
Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.
Cite as: GridCensus, “TAP302632 substation, Texas”, https://gridcensus.com/substations/texas/tap302632-34f53114 (data as of June 29, 2026).
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
Every site and score for TAP302632 substation, Texas is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.