Skip to content
Gridcensus

QUINTANA

Substation

Texas

Max voltage
69
kV

QUINTANA is an electric transmission substation in Texas. It is classified as distribution (69–115 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage69 kV
Min voltage69 kV
Voltage classDistribution (69–115 kV)
Connected lines2

Ownership & operation

Operator not catalogued for this substation.

StateTexas
Coordinates28.9321, -95.3179

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of QUINTANA, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near QUINTANA substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
Freeport EnergyBrownfieldTXBrazoria County138 kV776 MW3.5 yrs69.9
DOW VELASCOSubstation-AdjacentTXBrazoria County345 kV600 MW3.5 yrs64.3
CAVERNSubstation-AdjacentTXBrazoria County345 kV600 MW3.5 yrs64.2
UNKNOWN307821Substation-AdjacentTXBrazoria County345 kV600 MW3.5 yrs64.1
Ascend Performance Materials Texas Inc.BrownfieldTXBrazoria138 kV3 MW3.5 yrs62.4
EC Near Ascend Performance Materials Texas Inc.GreenfieldTXBrazoria——3.5 yrs61.1
EC Near Freeport Energy CenterGreenfieldTXBrazoria——3.5 yrs60.4
EC Near Freeport Energy CenterGreenfieldTXBrazoria——3.5 yrs60.0

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for QUINTANA substation, Texas is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.