MIDLOTHIAN ENERGY FACILITY

Substation

Texas

Max voltage
345
kV

MIDLOTHIAN ENERGY FACILITY is an electric transmission substation in Texas. It is classified as high-voltage (345 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage345 kV
Min voltage69 kV
Voltage classHigh-voltage (345 kV)
Connected lines3

Ownership & operation

Operator not catalogued for this substation.

StateTexas
Coordinates32.4285, -97.0528

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of MIDLOTHIAN ENERGY FACILITY, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near MIDLOTHIAN ENERGY FACILITY substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
LIGGETTSubstation-AdjacentTXDallas County345 kV600 MW1.7 yrs66.0
WEST LEVEESubstation-AdjacentTXDallas County345 kV600 MW1.7 yrs66.0
UNKNOWN306290Substation-AdjacentTXDallas County345 kV600 MW1.7 yrs66.0
NORWOODSubstation-AdjacentTXDallas County345 kV600 MW1.7 yrs65.8
Village Creek Water Reclamation FacilityBrownfieldTXTarrant County138 kV1 MW3.4 yrs65.2
SARGENT ROADSubstation-AdjacentTXDallas County345 kV600 MW1.7 yrs64.7
EC FFE Tarrant CountyGreenfieldTXTarrant County3.4 yrs64.7
OZ TarrantGreenfieldTXTarrant3.4 yrs64.4

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen