Skip to content
Gridcensus

LOST PINE

Substation

Texas

Max voltage
345
kV

LOST PINE is an electric transmission substation in Texas. It is classified as high-voltage (345 kv) and connects 6 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage345 kV
Min voltage69 kV
Voltage classHigh-voltage (345 kV)
Connected lines6

Ownership & operation

Operator not catalogued for this substation.

StateTexas
Coordinates30.1478, -97.2728

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of LOST PINE, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near LOST PINE substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
DECKERSubstation-AdjacentTXTravis County345 kV600 MW3.5 yrs70.0
UNKNOWN304304Substation-AdjacentTXTravis County345 kV600 MW3.5 yrs68.5
DESSAUSubstation-AdjacentTXTravis County345 kV600 MW3.5 yrs68.3
DUNLAPSubstation-AdjacentTXTravis County345 kV600 MW3.5 yrs67.6
ROUND ROCK NORTHEASTSubstation-AdjacentTXWilliamson County345 kV600 MW3.5 yrs67.5
AUSTROPSubstation-AdjacentTXTravis County345 kV600 MW3.5 yrs67.3
GARFIELDSubstation-AdjacentTXTravis County345 kV600 MW3.5 yrs67.0
EC Near GRS Sunset FarmsGreenfieldTXTravis——3.5 yrs65.7

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for LOST PINE substation, Texas is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.