At a glance

JAYBEE is a 115 kV electric substation in Texas, recorded in the HIFLD transmission dataset. 0 transmission lines connect to it. 236 of Texas's 1,426 named substations operate in a higher voltage band. The highest-scoring datacenter candidate site within about 25 miles is TAP302515 in Yoakum County, with a DC Readiness score of 59/100.

JAYBEE is an electric transmission substation in Texas. It is classified as sub-transmission (115 kv) and connects 0 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage14 kV
Voltage classSub-transmission (115 kV)
Connected lines0

Ownership

No owner is recorded for the lines that connect here.

StateTexas
Coordinates32.9645, -102.6902

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of JAYBEE, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near JAYBEE substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
TAP302515Substation-AdjacentTXYoakum County230 kV300 MW3.5 yrs59.1
MUSTANGSubstation-AdjacentTXYoakum County230 kV300 MW3.5 yrs59.0
WASSON SWITCHINGSubstation-AdjacentTXYoakum County230 kV300 MW3.5 yrs58.9
UNKNOWN302167Substation-AdjacentTXYoakum County230 kV300 MW3.5 yrs58.9
TAP308106Substation-AdjacentTXYoakum County230 kV300 MW3.5 yrs58.8
SEMINOLESubstation-AdjacentTXGaines County230 kV300 MW3.5 yrs58.2
EC Near Gaines CountyGreenfieldTXGaines——3.5 yrs56.7
EC Near Gaines CountyGreenfieldTXGaines——3.5 yrs56.5

How does JAYBEE compare with other substations in Texas?

Texas has 4,939 substation records in HIFLD, of which 1,426 carry a station name; the rest are unnamed tap points, risers and line ends. 1,020 named substations in the state are in JAYBEE's 115–229 kV band (72% of named stations). 236 sit in a higher band. 200 named substations in Texas operate at 345 kV or above. The highest voltage recorded in the state is 500 kV, and the state median is 138 kV.

How do candidate sites near JAYBEE score?

The 8 highest-scoring candidate sites within about 25 miles range from 57 to 59 on the 0–100 DC Readiness scale. They fall in Yoakum County, Gaines County, Gaines. The Texas average across 6,839 scored sites is 56.4. 3,635 of those Texas sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

What voltage is JAYBEE substation?

JAYBEE has a maximum voltage of 115 kV and a minimum of 14 kV. That places it in the 115–229 kV band. The median named US substation in this dataset is 115 kV, so JAYBEE is at the national midpoint.

How many transmission lines connect to JAYBEE substation?

0 transmission lines terminate at or pass through JAYBEE in the HIFLD line data.

Where is JAYBEE substation located?

JAYBEE is in Texas at 32.9645, -102.6902. The datacenter candidate sites closest to it are in Yoakum County, Gaines County, Gaines.

Are there datacenter candidate sites near JAYBEE substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of JAYBEE. The highest-scoring is TAP302515 at 59/100. Across Texas, the average DC Readiness score is 56.4.

Other 115 kV substations in Texas

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “JAYBEE substation, Texas”, https://gridcensus.com/substations/texas/jaybee-ff7c41d8 (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for JAYBEE substation, Texas is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.