FORT LANCASTER is an electric transmission substation in Texas. It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage138 kV
Min voltage69 kV
Voltage classSub-transmission (138 kV)
Connected lines3

Ownership & operation

Operator not catalogued for this substation.

StateTexas
Coordinates30.6635, -101.7787

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of FORT LANCASTER, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near FORT LANCASTER substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
WEST YATES TAPSubstation-AdjacentTXUpton County138 kV100 MW3.5 yrs52.2
WEST YATES SWITCHSubstation-AdjacentTXUpton County138 kV100 MW3.5 yrs51.9
DESERT SKYSubstation-AdjacentTXUpton County138 kV100 MW3.5 yrs51.8
MESA VIEWSubstation-AdjacentTXUpton County138 kV100 MW3.5 yrs51.6
UNKNOWN309081Substation-AdjacentTXReagan County69 kV50 MW3.5 yrs51.6
MESA VIEW SWITCHSubstation-AdjacentTXUpton County138 kV100 MW3.5 yrs51.2
POWELL OIL FIELDSubstation-AdjacentTXCrockett County69 kV50 MW3.5 yrs51.0
FORT LANCASTERSubstation-AdjacentTXCrockett County138 kV100 MW3.5 yrs50.8

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for FORT LANCASTER substation, Texas is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.