At a glance

BUCKEYE is a 138 kV electric substation in Texas on BANDERA ELECTRIC COOP, INC's transmission network, recorded in the HIFLD transmission dataset. 3 transmission lines connect to it. 236 of Texas's 1,426 named substations operate in a higher voltage band. The highest-scoring datacenter candidate site within about 25 miles is CALAVERAS 345 SWITCHYARD in Bexar County, with a DC Readiness score of 70/100.

BUCKEYE is an electric transmission substation in Texas, on BANDERA ELECTRIC COOP, INC's transmission network. It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage138 kV
Min voltage69 kV
Voltage classSub-transmission (138 kV)
Connected lines3

Ownership

Line owner (most lines)BANDERA ELECTRIC COOP, INC
StateTexas
Coordinates29.4937, -98.5246

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#302927138 kVBANDERA ELECTRIC COOP, INCIN SERVICE2.6 mi
#303919138 kVBANDERA ELECTRIC COOP, INCIN SERVICE1.9 mi
#308924138 kVBANDERA ELECTRIC COOP, INCIN SERVICE2.6 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of BUCKEYE, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near BUCKEYE substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
CALAVERAS 345 SWITCHYARDSubstation-AdjacentTXBexar County345 kV600 MW3.5 yrs70.0
CAGNON ROADSubstation-AdjacentTXBexar County345 kV600 MW3.5 yrs69.3
ARTHUR VON ROSENBERGSubstation-AdjacentTXBexar County345 kV600 MW3.5 yrs68.9
BROOKS FIELDSubstation-AdjacentTXBexar County345 kV600 MW3.5 yrs68.6
SKYLINESubstation-AdjacentTXBexar County345 kV600 MW3.5 yrs68.5
HILL COUNTRY 345Substation-AdjacentTXBexar County345 kV600 MW3.5 yrs68.2
EC Near W B TuttleGreenfieldTXBexar——3.5 yrs68.1
EC Near Tessman RoadGreenfieldTXBexar——3.5 yrs67.4

How does BUCKEYE compare with other substations in Texas?

Texas has 4,939 substation records in HIFLD, of which 1,426 carry a station name; the rest are unnamed tap points, risers and line ends. 1,020 named substations in the state are in BUCKEYE's 115–229 kV band (72% of named stations). 236 sit in a higher band. 200 named substations in Texas operate at 345 kV or above. The highest voltage recorded in the state is 500 kV, and the state median is 138 kV.

Who owns the transmission lines at BUCKEYE?

The 3 connected lines listed above are owned by BANDERA ELECTRIC COOP, INC. Line voltages range from 138 kV to 138 kV. Their combined recorded length is about 7.1 miles.

How do candidate sites near BUCKEYE score?

The 8 highest-scoring candidate sites within about 25 miles range from 67 to 70 on the 0–100 DC Readiness scale. They fall in Bexar County, Bexar. The Texas average across 6,839 scored sites is 56.4. 3,635 of those Texas sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

What voltage is BUCKEYE substation?

BUCKEYE has a maximum voltage of 138 kV and a minimum of 69 kV. That places it in the 115–229 kV band. The median named US substation in this dataset is 115 kV, so BUCKEYE is above the national midpoint.

How many transmission lines connect to BUCKEYE substation?

3 transmission lines terminate at or pass through BUCKEYE in the HIFLD line data. The connected lines listed here run at 138 kV. Together the listed lines cover about 7.1 miles.

Who owns BUCKEYE substation?

HIFLD does not publish substation owners directly. Most of the transmission lines that end at BUCKEYE belong to BANDERA ELECTRIC COOP, INC. GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.

Where is BUCKEYE substation located?

BUCKEYE is in Texas at 29.4937, -98.5246. The datacenter candidate sites closest to it are in Bexar County, Bexar.

Are there datacenter candidate sites near BUCKEYE substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of BUCKEYE. The highest-scoring is CALAVERAS 345 SWITCHYARD at 70/100. Across Texas, the average DC Readiness score is 56.4.

Other 138 kV substations in Texas

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “BUCKEYE substation, Texas”, https://gridcensus.com/substations/texas/buckeye-56ba81ab (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for BUCKEYE substation, Texas is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.