BORDEN CO
SubstationTexas · ONCOR ELECTRIC DELIVERY CO.
At a glance
BORDEN CO is an electric transmission substation in Texas, on ONCOR ELECTRIC DELIVERY CO.'s transmission network. It is classified as high-voltage (230 kv) and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Ownership
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #309300 | 230 kV | LYNTEGAR ELECTRIC COOP, INC | IN SERVICE | 34.1 mi |
| #301008 | 138 kV | ONCOR ELECTRIC DELIVERY CO. | IN SERVICE | 49.7 mi |
| #301316 | 138 kV | ONCOR ELECTRIC DELIVERY CO. | IN SERVICE | 16.8 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of BORDEN CO, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| UNKNOWN301484 | Substation-Adjacent | TX | Howard County | 345 kV | 600 MW | 3.5 yrs | 63.6 |
| UNKNOWN300682 | Substation-Adjacent | TX | Howard County | 345 kV | 600 MW | 3.5 yrs | 63.2 |
| OZ Howard | Greenfield | TX | Howard | — | — | 3.5 yrs | 62.1 |
| UNKNOWN310087 | Substation-Adjacent | TX | Martin County | 345 kV | 600 MW | 3.5 yrs | 61.6 |
| UNKNOWN303793 | Substation-Adjacent | TX | Borden County | 345 kV | 600 MW | 3.5 yrs | 60.9 |
| UNKNOWN305803 | Substation-Adjacent | TX | Borden County | 345 kV | 600 MW | 3.5 yrs | 60.2 |
| OZ Dawson | Greenfield | TX | Dawson | — | — | 3.5 yrs | 59.6 |
| UNKNOWN303007 | Substation-Adjacent | TX | Howard County | 138 kV | 100 MW | 3.5 yrs | 57.7 |
How does BORDEN CO compare with other substations in Texas?
Texas has 4,939 substation records in HIFLD, of which 1,426 carry a station name; the rest are unnamed tap points, risers and line ends. 36 named substations in the state are in BORDEN CO's 230–344 kV band (3% of named stations). 200 sit in a higher band. 200 named substations in Texas operate at 345 kV or above. The highest voltage recorded in the state is 500 kV, and the state median is 138 kV.
Who owns the transmission lines at BORDEN CO?
The 3 connected lines listed above are owned by LYNTEGAR ELECTRIC COOP, INC, ONCOR ELECTRIC DELIVERY CO. Line voltages range from 138 kV to 230 kV. Their combined recorded length is about 100.6 miles.
How do candidate sites near BORDEN CO score?
The 8 highest-scoring candidate sites within about 25 miles range from 58 to 64 on the 0–100 DC Readiness scale. They fall in Howard County, Howard, Martin County, Borden County. The Texas average across 6,839 scored sites is 56.4. 3,635 of those Texas sites are classed as substation sites (candidate locations generated at an existing substation).
Frequently asked questions
What voltage is BORDEN CO substation?
BORDEN CO has a maximum voltage of 230 kV and a minimum of 69 kV. That places it in the 230–344 kV band. The median named US substation in this dataset is 115 kV, so BORDEN CO is above the national midpoint.
How many transmission lines connect to BORDEN CO substation?
1 transmission line terminate at or pass through BORDEN CO in the HIFLD line data. The connected lines listed here run at 230 kV, 138 kV. Together the listed lines cover about 100.6 miles.
Who owns BORDEN CO substation?
HIFLD does not publish substation owners directly. Most of the transmission lines that end at BORDEN CO belong to ONCOR ELECTRIC DELIVERY CO., and others to LYNTEGAR ELECTRIC COOP, INC. GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.
Where is BORDEN CO substation located?
BORDEN CO is in Texas at 32.5616, -101.5968. The datacenter candidate sites closest to it are in Howard County, Howard, Martin County.
Are there datacenter candidate sites near BORDEN CO substation?
GridCensus lists at least 8 scored candidate sites within roughly 25 miles of BORDEN CO. The highest-scoring is UNKNOWN301484 at 64/100. Across Texas, the average DC Readiness score is 56.4.
Other 230 kV substations in Texas
- NICHOLS· 14 lines
- PLANT X· 11 lines
- MOORE COUNTY· 10 lines
- HARRINGTON· 9 lines
- PORT ACRES BULK· 9 lines
- HUTCHINSON COUNTY· 8 lines
- KOLBS· 8 lines
- MUSTANG· 8 lines
- All named substations in Texas· 1,426 stations
- Datacenter candidate sites in Texas· 6,839 sites
- Brownfield and retired plant sites in Texas
- Substations by state
About this data
Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.
Cite as: GridCensus, “BORDEN CO substation, Texas”, https://gridcensus.com/substations/texas/borden-co-ac1531e9 (data as of June 29, 2026).
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
Every site and score for BORDEN CO substation, Texas is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.