Skip to content
Gridcensus

TAP154614

Substation

Tennessee

Max voltage
—
kV

TAP154614 is an electric transmission substation in Tennessee. It is classified as unclassified and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Voltage classUnclassified
Connected lines3

Ownership & operation

Operator not catalogued for this substation.

Coordinates36.0798, -83.1703

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP154614, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP154614 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
OZ HamblenGreenfieldTNHamblen——3.9 yrs64.0
OZ HamblenGreenfieldTNHamblen——3.9 yrs63.9
PHILLIPS BENDSubstation-AdjacentTNHawkins County500 kV1,000 MW4.7 yrs63.8
EC Coal Hamblen CountyGreenfieldTNHamblen County——3.9 yrs63.3
Greenfield (PHILLIPS BEND - VOLUNTEER)GreenfieldTNGrainger County500 kV1,000 MW3.9 yrs62.9
EC Near John SevierGreenfieldTNHawkins——3.9 yrs61.9
CHEROKEE DAMSubstation-AdjacentTNGrainger County161 kV100 MW3.9 yrs61.8
BULLS GAPSubstation-AdjacentTNHamblen County161 kV100 MW3.9 yrs61.7

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for TAP154614 substation, Tennessee is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.