Skip to content
Gridcensus

NAGEL

Substation

Tennessee

Max voltage
500
kV

NAGEL is an electric transmission substation in Tennessee. It is classified as extra-high-voltage (500 kv) and connects 8 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage500 kV
Min voltage138 kV
Voltage classExtra-high-voltage (500 kV)
Connected lines8

Ownership & operation

Operator not catalogued for this substation.

Coordinates36.5906, -82.6960

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of NAGEL, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near NAGEL substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
NAGELSubstation-AdjacentTNScott County500 kV1,000 MW1.0 yrs68.8
PHILLIPS BENDSubstation-AdjacentTNHawkins County500 kV1,000 MW1.0 yrs67.5
OZ SullivanGreenfieldTNSullivan3.7 yrs64.6
EC Coal Hawkins CountyGreenfieldTNHawkins County3.7 yrs64.5
OZ HawkinsGreenfieldTNHawkins3.7 yrs64.4
EC Coal Hawkins CountyGreenfieldTNHawkins County3.7 yrs64.1
EC Near John SevierGreenfieldTNHawkins3.7 yrs63.8
EC Coal Greene CountyGreenfieldTNGreene County3.7 yrs63.5

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for NAGEL substation, Tennessee. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.