BONWOOD

Substation

Tennessee

Max voltage
161
kV

BONWOOD is an electric transmission substation in Tennessee. It is classified as sub-transmission (138 kv) and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage161 kV
Min voltage161 kV
Voltage classSub-transmission (138 kV)
Connected lines1

Ownership & operation

Operator not catalogued for this substation.

Coordinates35.5542, -88.8145

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of BONWOOD, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near BONWOOD substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
JACKSONSubstation-AdjacentTNMadison County500 kV1,000 MW1.0 yrs67.5
BROWNSVILLESubstation-AdjacentTNHaywood County500 kV1,000 MW1.0 yrs66.1
OZ GibsonGreenfieldTNGibson3.7 yrs62.9
OZ MadisonGreenfieldTNMadison3.7 yrs62.8
OZ HardemanGreenfieldTNHardeman3.7 yrs61.7
OZ MadisonGreenfieldTNMadison3.7 yrs60.7
OZ CrockettGreenfieldTNCrockett3.7 yrs59.8
OZ HendersonGreenfieldTNHenderson3.7 yrs59.7

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for BONWOOD substation, Tennessee. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.