Max voltage
69
kV

At a glance

TAP204125 is a 69 kV electric substation in South Dakota on BLACK HILLS POWER, INC.'s transmission network, recorded in the HIFLD transmission dataset. 2 transmission lines connect to it. The highest-scoring datacenter candidate site within about 25 miles is EC Coal Pennington County in Pennington County, with a DC Readiness score of 67/100.

TAP204125 is an electric transmission substation in South Dakota, on BLACK HILLS POWER, INC.'s transmission network. It is classified as distribution (69–115 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage69 kV
Min voltage69 kV
Voltage classDistribution (69–115 kV)
Connected lines2

Ownership

Line owner (most lines)BLACK HILLS POWER, INC.
Coordinates44.0240, -103.2497

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#14367669 kV—IN SERVICE0.4 mi
#20224269 kVBLACK HILLS POWER, INC.—1.4 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP204125, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP204125 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
EC Coal Pennington CountyGreenfieldSDPennington County——4.3 yrs66.9
SOUTH RAPID CITYSubstation-AdjacentSDPennington County230 kV300 MW4.3 yrs66.8
RAPID CITY DC TIESubstation-AdjacentSDPennington County230 kV300 MW4.3 yrs65.9
LANGESubstation-AdjacentSDPennington County230 kV300 MW4.3 yrs65.8
EC Near Ben FrenchGreenfieldSDPennington——4.3 yrs65.7
EC Near Ben FrenchGreenfieldSDPennington——4.3 yrs65.2
EC Coal Pennington CountyGreenfieldSDPennington County——4.3 yrs64.6
EC Near Ben FrenchGreenfieldSDPennington——4.3 yrs64.4

Who owns the transmission lines at TAP204125?

The 2 connected lines listed above are owned by BLACK HILLS POWER, INC. Line voltages range from 69 kV to 69 kV. Their combined recorded length is about 1.8 miles.

How do candidate sites near TAP204125 score?

The 8 highest-scoring candidate sites within about 25 miles range from 64 to 67 on the 0–100 DC Readiness scale. They fall in Pennington County, Pennington. The South Dakota average across 1,151 scored sites is 54.7. 477 of those South Dakota sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

What voltage is TAP204125 substation?

TAP204125 has a maximum voltage of 69 kV. That places it in the 69–114 kV band. The median named US substation in this dataset is 115 kV, so TAP204125 is below the national midpoint.

How many transmission lines connect to TAP204125 substation?

2 transmission lines terminate at or pass through TAP204125 in the HIFLD line data. The connected lines listed here run at 69 kV. Together the listed lines cover about 1.8 miles.

Who owns TAP204125 substation?

HIFLD does not publish substation owners directly. Most of the transmission lines that end at TAP204125 belong to BLACK HILLS POWER, INC. GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.

Where is TAP204125 substation located?

TAP204125 is in South Dakota at 44.0240, -103.2497. The datacenter candidate sites closest to it are in Pennington County, Pennington.

Are there datacenter candidate sites near TAP204125 substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of TAP204125. The highest-scoring is EC Coal Pennington County at 67/100. Across South Dakota, the average DC Readiness score is 54.7.

More in South Dakota

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “TAP204125 substation, South Dakota”, https://gridcensus.com/substations/south-dakota/tap204125-ae048d64 (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for TAP204125 substation, South Dakota is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.