TAP167740

Substation

South Dakota · OTTER TAIL POWER CO

Max voltage
69
kV

At a glance

TAP167740 is a 69 kV electric substation in South Dakota on OTTER TAIL POWER CO's transmission network, recorded in the HIFLD transmission dataset. 3 transmission lines connect to it. The highest-scoring datacenter candidate site within about 25 miles is EC Near Lake Preston in Kingsbury, with a DC Readiness score of 60/100.

TAP167740 is an electric transmission substation in South Dakota, on OTTER TAIL POWER CO's transmission network. It is classified as distribution (69–115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage69 kV
Min voltage69 kV
Voltage classDistribution (69–115 kV)
Connected lines3

Ownership

Line owner (most lines)OTTER TAIL POWER CO
Coordinates44.3767, -97.1491

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#16878569 kVOTTER TAIL POWER COIN SERVICE3.5 mi
#16878669 kVOTTER TAIL POWER COIN SERVICE0.0 mi
#16879769 kVOTTER TAIL POWER COIN SERVICE10.6 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP167740, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP167740 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
EC Near Lake PrestonGreenfieldSDKingsbury——4.3 yrs60.3
EC Near Lake PrestonGreenfieldSDKingsbury——4.3 yrs60.1
Lake PrestonBrownfieldSDKingsbury County—24 MW4.3 yrs60.0
EC Near Lake PrestonGreenfieldSDKingsbury——4.3 yrs59.4
EC Near Lake PrestonGreenfieldSDKingsbury——4.3 yrs59.3
EC Near Lake PrestonGreenfieldSDKingsbury——4.3 yrs59.1
EC Near Lake PrestonGreenfieldSDKingsbury——4.3 yrs58.9
EC Near Lake PrestonGreenfieldSDKingsbury——4.3 yrs58.8

Who owns the transmission lines at TAP167740?

The 3 connected lines listed above are owned by OTTER TAIL POWER CO. Line voltages range from 69 kV to 69 kV. Their combined recorded length is about 14.2 miles.

How do candidate sites near TAP167740 score?

The 8 highest-scoring candidate sites within about 25 miles range from 59 to 60 on the 0–100 DC Readiness scale. They fall in Kingsbury, Kingsbury County. The South Dakota average across 1,151 scored sites is 54.7. 477 of those South Dakota sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

What voltage is TAP167740 substation?

TAP167740 has a maximum voltage of 69 kV. That places it in the 69–114 kV band. The median named US substation in this dataset is 115 kV, so TAP167740 is below the national midpoint.

How many transmission lines connect to TAP167740 substation?

3 transmission lines terminate at or pass through TAP167740 in the HIFLD line data. The connected lines listed here run at 69 kV. Together the listed lines cover about 14.2 miles.

Who owns TAP167740 substation?

HIFLD does not publish substation owners directly. Most of the transmission lines that end at TAP167740 belong to OTTER TAIL POWER CO. GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.

Where is TAP167740 substation located?

TAP167740 is in South Dakota at 44.3767, -97.1491. The datacenter candidate sites closest to it are in Kingsbury, Kingsbury County.

Are there datacenter candidate sites near TAP167740 substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of TAP167740. The highest-scoring is EC Near Lake Preston at 60/100. Across South Dakota, the average DC Readiness score is 54.7.

More in South Dakota

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “TAP167740 substation, South Dakota”, https://gridcensus.com/substations/south-dakota/tap167740-c6db6c68 (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for TAP167740 substation, South Dakota is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.