TAP161858
SubstationSouth Dakota · OTTER TAIL POWER CO
At a glance
TAP161858 is an electric transmission substation in South Dakota, on OTTER TAIL POWER CO's transmission network. It is classified as unclassified and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #162770 | 42 kV | OTTER TAIL POWER CO | IN SERVICE | 7.4 mi |
| #178241 | 42 kV | OTTER TAIL POWER CO | — | 1.3 mi |
| #178242 | 42 kV | OTTER TAIL POWER CO | — | 1.5 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of TAP161858, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| UNKNOWN131209 | Substation-Adjacent | SD | Clark County | 230 kV | 300 MW | 4.3 yrs | 61.9 |
| EC Near Lake Preston | Greenfield | SD | Kingsbury | — | — | 4.3 yrs | 60.3 |
| EC Near Lake Preston | Greenfield | SD | Kingsbury | — | — | 4.3 yrs | 60.1 |
| Lake Preston | Brownfield | SD | Kingsbury County | — | 24 MW | 4.3 yrs | 60.0 |
| EC Near Lake Preston | Greenfield | SD | Kingsbury | — | — | 4.3 yrs | 59.4 |
| EC Near Lake Preston | Greenfield | SD | Kingsbury | — | — | 4.3 yrs | 59.3 |
| EC Near Lake Preston | Greenfield | SD | Kingsbury | — | — | 4.3 yrs | 59.1 |
| EC Near Lake Preston | Greenfield | SD | Kingsbury | — | — | 4.3 yrs | 58.9 |
Who owns the transmission lines at TAP161858?
The 3 connected lines listed above are owned by OTTER TAIL POWER CO. Line voltages range from 42 kV to 42 kV. Their combined recorded length is about 10.2 miles.
How do candidate sites near TAP161858 score?
The 8 highest-scoring candidate sites within about 25 miles range from 59 to 62 on the 0–100 DC Readiness scale. They fall in Clark County, Kingsbury, Kingsbury County. The South Dakota average across 1,151 scored sites is 54.7. 477 of those South Dakota sites are classed as substation sites (candidate locations generated at an existing substation).
Frequently asked questions
How many transmission lines connect to TAP161858 substation?
1 transmission line terminate at or pass through TAP161858 in the HIFLD line data. The connected lines listed here run at 42 kV. Together the listed lines cover about 10.2 miles.
Who owns TAP161858 substation?
HIFLD does not publish substation owners directly. Most of the transmission lines that end at TAP161858 belong to OTTER TAIL POWER CO. GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.
Where is TAP161858 substation located?
TAP161858 is in South Dakota at 44.3976, -97.5417. The datacenter candidate sites closest to it are in Clark County, Kingsbury, Kingsbury County.
Are there datacenter candidate sites near TAP161858 substation?
GridCensus lists at least 8 scored candidate sites within roughly 25 miles of TAP161858. The highest-scoring is UNKNOWN131209 at 62/100. Across South Dakota, the average DC Readiness score is 54.7.
More in South Dakota
About this data
Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.
Cite as: GridCensus, “TAP161858 substation, South Dakota”, https://gridcensus.com/substations/south-dakota/tap161858-f95a5da0 (data as of June 29, 2026).
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
Every site and score for TAP161858 substation, South Dakota is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.