TAP159375
SubstationSouth Dakota · NORTHWESTERN ENERGY
At a glance
TAP159375 is an electric transmission substation in South Dakota, on NORTHWESTERN ENERGY's transmission network. It is classified as unclassified and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #161715 | — | NORTHWESTERN ENERGY | IN SERVICE | 5.4 mi |
| #162576 | — | — | IN SERVICE | 4.1 mi |
| #162577 | — | — | IN SERVICE | 10.2 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of TAP159375, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| FORT THOMPSON | Substation-Adjacent | SD | Buffalo County | 345 kV | 600 MW | 4.3 yrs | 63.0 |
| UNKNOWN133185 | Substation-Adjacent | SD | Hyde County | 230 kV | 300 MW | 4.3 yrs | 61.9 |
| EC Near Future CT | Greenfield | SD | Hyde | — | — | 4.3 yrs | 59.4 |
| EC Near Highmore | Greenfield | SD | Hyde | — | — | 4.3 yrs | 59.3 |
| EC Near Future CT | Greenfield | SD | Hyde | — | — | 4.3 yrs | 58.8 |
| EC Near Future CT | Greenfield | SD | Hyde | — | — | 4.3 yrs | 58.7 |
| EC Near Highmore | Greenfield | SD | Hyde | — | — | 4.3 yrs | 58.7 |
| EC Near Future CT | Greenfield | SD | Hyde | — | — | 4.3 yrs | 58.5 |
Who owns the transmission lines at TAP159375?
The 3 connected lines listed above are owned by NORTHWESTERN ENERGY. Their combined recorded length is about 19.8 miles.
How do candidate sites near TAP159375 score?
The 8 highest-scoring candidate sites within about 25 miles range from 59 to 63 on the 0–100 DC Readiness scale. They fall in Buffalo County, Hyde County, Hyde. The South Dakota average across 1,151 scored sites is 54.7. 477 of those South Dakota sites are classed as substation sites (candidate locations generated at an existing substation).
Frequently asked questions
How many transmission lines connect to TAP159375 substation?
3 transmission lines terminate at or pass through TAP159375 in the HIFLD line data. Together the listed lines cover about 19.8 miles.
Who owns TAP159375 substation?
HIFLD does not publish substation owners directly. Most of the transmission lines that end at TAP159375 belong to NORTHWESTERN ENERGY. GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.
Where is TAP159375 substation located?
TAP159375 is in South Dakota at 44.5205, -99.3411. The datacenter candidate sites closest to it are in Buffalo County, Hyde County, Hyde.
Are there datacenter candidate sites near TAP159375 substation?
GridCensus lists at least 8 scored candidate sites within roughly 25 miles of TAP159375. The highest-scoring is FORT THOMPSON at 63/100. Across South Dakota, the average DC Readiness score is 54.7.
More in South Dakota
About this data
Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.
Cite as: GridCensus, “TAP159375 substation, South Dakota”, https://gridcensus.com/substations/south-dakota/tap159375-3e67c183 (data as of June 29, 2026).
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
Every site and score for TAP159375 substation, South Dakota is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.